- 1、本文档共80页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2013年国考测真题及答案解析【华图教育完整版】
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the quality management system of the project. A management review meeting held each year, on the implementation of the quality policy, objectives and review of the problems and propose corrective measures. Efforts and resources necessary for optimal allocation of project construction management (personnel, finance, facilities, information, etc). 3.2 with customer focus project staff establish a customer-focused thinking, fully aware that meet their customers needs and expectations is the fundamental pursuit of production and services projects. Projects in production and service processes, to: 3.2.1 identify and determine the needs and expectations of the project legal person, interests as the interests of the customer, with customer satisfaction as satisfied, good faith and cooperation, win-win and development; 3.2.2 needs and expectations of the project legal person into production and service management or technical requirements, and allocation of appropriate resources; 3.2.3 meet legal requirements and strive to exceed their expectations. 3.2.4 customers on the quality of projects put into operation for standards, in accordance with the national standard of quality works. 3.2.5 regulations and standards requires the State and issued by the Ministry of the project related to the current version of the technical specifications, procedures, design institutes and
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the quality mana
您可能关注的文档
- 2013届奉贤初三英语一模试卷及答案.doc
- 2013届普陀初三英语一模试卷及答案.doc
- 2013宝钢股财务报表分析.docx
- 2013届静安初三英语一模试卷及答案.doc
- 2013届酒店理班春期班主任工作手册.doc
- 2013宗教政法规知识百题(题库二).doc
- 2013届江苏泰州市海陵区九年级中考二模语文试卷(带解析).doc
- 2013届高三治专题复习课案:第二单元 生产、劳动和经营(新人教必修1).doc
- 2013届高考治一轮复习考案生活与哲学第四单元.doc
- 2013年1-0月份全国房地产开发和销售情况.doc
- 2023年度安全员考试题库检测试题打印附答案详解(达标题).docx
- 2023年度安全员考试题库检测试题打印(实用)附答案详解.docx
- 2023年度安全员考试题库检测试题打印附完整答案详解【名师系列】.docx
- 2023年度安全员考试题库检测试题打印及答案详解【考点梳理】.docx
- 2023年度安全员考试题库检测试题打印附完整答案详解【各地真题】.docx
- 2023年度安全员考试题库检测试题打印附参考答案详解【完整版】.docx
- 2023年度安全员考试高分题库含答案详解(精练).docx
- 2023年度安全员考试高分题库及参考答案详解【能力提升】.docx
- 2023年度安全员考试高分题库附答案详解【典型题】.docx
- 2023年度安全员考试高分题库及参考答案详解(培优B卷).docx
文档评论(0)