Okbsxz暨大学管理学与微观经济学考试大纲.docVIP

  • 2
  • 0
  • 约5.44千字
  • 约 6页
  • 2016-09-30 发布于浙江
  • 举报

Okbsxz暨大学管理学与微观经济学考试大纲.doc

Okbsxz暨大学管理学与微观经济学考试大纲

生命是永恒不断的创造,因为在它内部蕴含着过剩的精力,它不断流溢,越出时间和空间的界限,它不停地追求,以形形色色的自我表现的形式表现出来。--泰戈尔I.考查目标 2 II.考试形式与试卷结构 2 一、试卷满分及考试时间 2 二、答题方式 2 三、试卷内容结构 2 四、试卷题型结构 2 III.考查范围 3 I.II.考试与 一、 本试卷满分为150分,考试时间为180分钟。 二、 答题方式为闭卷、笔试。 三、 管理学原理 75分(50%) 微观经济学 75分(50%) 四、 选择题 15分 名词解释 15分 计算题 15分 分析题 15分 论述题 15分 III.买卖双方分摊怎么分摊弹性说了算。 企业管理硕士研究生入学考试大纲 暨南大学 the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection

文档评论(0)

1亿VIP精品文档

相关文档