- 4
- 0
- 约5.24千字
- 约 11页
- 2016-10-01 发布于贵州
- 举报
毕业二十周年聚整体方案
毕业二十周年聚会整体方案
岁月有痕 青春万岁
海南省农垦中学毕业周年聚会筹委会【免责声明】凡报名参加者均视为具有完全民事行为能力人如在活动中发生人身,不承担赔偿责任,由受损害人依据法律规定和本声明依法解决,凡报名者均视为接受本次声明。
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. 6.4.4.4 lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. 6.4.4.5 high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the corresponding
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measu
原创力文档

文档评论(0)