建筑工程质量监工作方案. - 副本.docVIP

  • 1
  • 0
  • 约5.26千字
  • 约 7页
  • 2016-10-04 发布于贵州
  • 举报
建筑工程质量监工作方案. - 副本

position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum

文档评论(0)

1亿VIP精品文档

相关文档