- 1
- 0
- 约5.26千字
- 约 7页
- 2016-10-04 发布于贵州
- 举报
建筑工程质量监工作方案. - 副本
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum
您可能关注的文档
最近下载
- 粘胶去除剂(中文).pdf VIP
- 2026校招:江苏国金资本运营集团试题及答案.doc VIP
- 江苏国金资本运营集团校招面笔试题及答案.doc VIP
- 《数据分析与应用》课件.ppt VIP
- 2026江苏国金资本运营集团秋招试题及答案.doc VIP
- 2025年3月天一联考高二作文审题指导和范文:精神胜利法.docx VIP
- 2026年河南应用技术职业学院单招职业适应性考试模拟测试卷附答案.docx VIP
- 最新Multisim+14.3汉化破解版下载附详细安装教程.pdf VIP
- 湖北宜昌市2026届高三3月调研考试生物试题(试卷+解析).docx VIP
- 2024-2025学年厦门一检初三英语试卷及答案.pdf VIP
原创力文档

文档评论(0)