- 2
- 0
- 约4.59千字
- 约 6页
- 2016-10-05 发布于贵州
- 举报
代理商成功之道训案1
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or ret
您可能关注的文档
- 从高考看考研专选择 国家领导人热衷专业盘点.doc
- 仓储SOP管理序宝供物流.doc
- 仓储物流管理论物流仓储毕业论文.doc
- 仓及物控的常规理知识.docx
- 仓储物业中心管制度.doc
- 仙女山旅游路线划书.doc
- 仙桃房地产市场究月报(2013年12月.doc
- 代县产业园区规及招商引资报告.doc
- 代码主板芯片级修论坛.docx
- 代用茶产品生产可证审查细则.doc
- 2025-2030中国笔记本电脑支架行业市场发展趋势与前景展望战略研究报告.docx
- 15BJZ164 装配式外墙外保温系统.docx
- 净水机海尔净水机HRO5009-5安装培训资料.pdf
- 2025-2030中国丙烯醛行业市场发展趋势与前景展望战略研究报告.docx
- 藻类、苔藓和蕨类植物.pptx
- 繁忙通航河道预应力混凝土连续梁桥非对称快速拆除技术研究.pptx
- 陕09G09 预应力混凝土空心板.docx
- 2025-2030年中国汽车发动机矿物油润滑剂行业市场现状供需分析及投资评估规划分析研究报告.docx
- 电梯的技术性能指标.pptx
- 2025-2030日光温室(SGH)行业市场现状供需分析及重点企业投资评估规划分析研究报告.docx
原创力文档

文档评论(0)