- 42
- 0
- 约 6页
- 2017-03-08 发布于贵州
- 举报
CAD中做立体字的方法
CAD中做立体文字的方法
be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-d
原创力文档

文档评论(0)