- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文合中同7-8
Incompetent or negligent in the performance of his duties or whose continued presence on the works is considered undesirable in the interest of the Employer. However, this power shall not be unreasonably exercised by the Supervising Engineer.
14.0 EXTENSION OF TIME BY REASON OF FORCE MAIEURE
14.1 If at any time during the execution of this contract, the progress of the works is delayed or suspended by reason of force majeure,that is,civil commotion, riot, strike, rebellion, revolution, or any cause which is unforeseen and outside the control of the partis herein and which affects the performance of the obligations of the Contractor under this Agreement,the Contractor shall fortheith give written notice of the cause of delay to the Supervising Officer/Consultant and if in the opinion of the Supervising Officer/Consultant the work is likely to be delayed beyond the date of completion, he shall grant extension of time within which to complete same provided that the granting of the extension of time by virtue of this Clause shall not entitle the Contractor to any additional payment.
15.0 INSURANCE
15.1 The Contractor shall insure in the joint names of the Employer and the Contractor against loss or damages from whatever cause arising including full and adequate compensation, in the event of such loss or damage and shall also insure against injury to the Contractor’s Employees engaged in the above works in such manner that the Employer and the Contractor are covered from the commencement of the works until final certificate of completion has been issued.Such insurance shall be effected with a reputable insurance company in terms acceptable to the Employer and the Contractor shall whenever required produce to the Supervising Officer/Consultant the policy or policies of insurance and the receipts for payments of the current premium.
16.0 MAINTENANCE
16.1 The Contractor hereby covenants to maintain the works without any cost to the Employer for a period lf 6 six mo
您可能关注的文档
- 节k能减排知识竞赛题库-2016.doc
- 节o自考合同法试题及答案.doc
- 节件能与能源管理概述.docx
- 节约能功源.doc
- 节能专篇(1一5).doc
- 节能减4排知识竞赛题库.docx
- 节能减排知识流竞赛题库题.doc
- 节自考 成考 调函授.doc
- 节英语统考复习题.doc
- 芜字湖事业单位《公共基础知识试题》.doc
- 2025及未来5年中国彩棉抽条圆领男衫裤市场数据分析及竞争策略研究报告.docx
- 2025及未来5年中国耐热果酱市场数据分析及竞争策略研究报告.docx
- 2025至未来5年中国通心窝钉市场数据分析及竞争策略研究报告.docx
- 2025及未来5年中国什锦罐头市场数据分析及竞争策略研究报告.docx
- 2025及未来5年中国衬氟塑球阀市场数据分析及竞争策略研究报告.docx
- 2025及未来5年中国对旋轴流局部通风机市场数据分析及竞争策略研究报告.docx
- 2025至未来5年中国苎麻棉双径布市场数据分析及竞争策略研究报告.docx
- 2025及未来5年中国金丽绒市场数据分析及竞争策略研究报告.docx
- 2025至未来5年中国净水处理过滤器市场数据分析及竞争策略研究报告.docx
- 2025及未来5年中国木制鞋撑市场数据分析及竞争策略研究报告.docx
原创力文档


文档评论(0)