- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
装饰博客日志的种花边图案
装饰博客日志的多种花边图案 1
博客制作 ??2009-05-29 10:24 ??阅读220???评论1 字号: 大大? 中中? 小小
我看到这些花边很好看,就介绍给大家,只要复制到日记就可以了
and performance test copies of the record. If necessary, review should be carried out; 4 for spring hangers included simple spring, hangers and constant support hangers it should also be recognized as setting and locking of loads. 5 check the surface quality, folded layering and without cracks, rust and other defects. 5 after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust torque limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness mm 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h mm 1-1.5 1.5-2 weld width b mm 5-6 7-6 has slope mouth weld strengthening height h mm 1.5-2 2 weld width b mm cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness mm 2--3 3--4 5--6 weld f
您可能关注的文档
- 行政复议法论文行政复议论文.doc
- 行政大厅、银行队叫号系统.doc
- 行政执法监督基知识考试试题.doc
- 行政管理-管理学11年秋第五次任务.doc
- 行政管理专业必文献.doc
- 行政管理专业阅书目.doc
- 行政管理学考试习内容.doc
- 行政管理学试题答案一.doc
- 行政管理支出分比较.doc
- 行政管理西方行制度答案(2011.10).doc
- 上海海洋大学《海洋环境分析技术》课件-21化学发光分析法.pdf
- 上海海洋大学《海洋环境分析技术》课件-20分子荧光分析法.pdf
- 上海海洋大学《海洋环境分析技术》课件-22色谱分离过程.pdf
- 上海海洋大学《海洋环境分析技术》课件-25气相色谱仪与固定液.pdf
- 上海海洋大学《海洋环境分析技术》课件-24色谱定性定量方法.pdf
- 上海海洋大学《海洋环境分析技术》课件-26气相色谱检测器.pdf
- 上海海洋大学《海洋环境分析技术》课件-29液相色谱固定相与流动相.pdf
- 上海海洋大学《海洋环境分析技术》课件-27气相色谱分离条件的选择.pdf
- 上海海洋大学《海洋环境分析技术》课件-28液相色谱仪器与类型.pdf
- 上海海洋大学《海洋环境分析技术》课件-3 原子光谱和分析光谱.pdf
文档评论(0)