- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
西南大学__语教学方法论(参考答案)2012年9月
西南大学 语文教学方法论
and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm)
and perform
您可能关注的文档
- 行政管理学考试习内容.doc
- 行政管理学试题答案一.doc
- 行政管理支出分比较.doc
- 行政管理西方行制度答案(2011.10).doc
- 行政院公平交易员会办事细则.doc
- 行测75分必备数字推理题解题技巧大全.doc.doc
- 行测【数字推理专家剖析解题技巧.doc
- 行测数字推理题考攻略.doc
- 行测数字推理技大全.doc
- 行测高分解题技大全.doc
- 2025年电商平台本地生活服务行业发展趋势预测报告.docx
- 疫苗行业研发创新与2025年重大疾病防控策略研究及案例分析报告.docx
- 户外运动装备租赁市场消费者行为分析与营销策略报告.docx
- 2025年工业机器人行业市场供需分析及预测研究报告.docx
- 2025社区智慧医疗远程手术协作人才培养策略报告.docx
- 沉浸式数字教育资源在初中物理实验课中的应用效果分析教学研究课题报告.docx
- 2025年废旧电子产品回收再利用行业政策影响评估报告.docx
- 2025年全球美容美发协作机器人市场潜力与行业应用研究报告.docx
- 高中英语教师批判性思维教学能力的提升路径.docx
- 工业机器人协作作业安全防护技术与实施路径2025年展望.docx
文档评论(0)