coupling Centre shall be checked, the second poured concrete strength of more than 70%. In the process of reaming or boring, apart from the special provisions in factory, does not allow any work that may affect the coupling Centre, such as irrigation, to cylinder connections to flood the condenser pipes and so on. Well boring, hinge bolt hole flange with coupling of vertical, not oblique. Mounting bolts should be added lubricants, typing gently with a small hammer, not too loose or too tight, packed the bolts with the corresponding seal screw hole should be marked. 6.4.5.4