- 1、本文档共35页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高一地理必修一~4单元复习资料
steel bolts, screws and studs GB/T3098.6-2000 scope of this project are: 1, 2, 3 aluminium sheet curtain wall of glass curtain wall and the Aluminum plastic Board curtain wall 4, and stone curtain wall 5, and curtain wall buried pieces 6, and light steel points type glass rain canopy, and aluminum Board rain canopy 7, and aluminum Venetian 8, and outdoor advertising (containing roofing and the State surface advertising) 9 to spring glass door 10, and concrete structure and curtain wall between of layer between, and around fire seal blocking 11, and anti-mine 12, and daughter wall top processing 13, and pan light ming, engineering of tie construction 14, and buildings of deformation sewing (settlement sewing, and expansion joints,) 15, and After the detailed design drawings issued a wall embedded part is inconsistent with the tenderer needs to increase fixed curtain wall structure 16, decorative surfaces and decorative surface and joints between parts of other buildings facing sealing process, required to support the outer decoration of a hole, hole, plugging holes and so on. This works more decorative items, in order to ensure that the decoration construction progress and quality, trying to avoid construction does not ... Processing. After installation is complete if you have damaged galvanized parts should
steel bolts, screws and studs GB/T3098.6-2000 scope of this project are: 1, 2, 3 aluminium sheet curtain wall of glass curtain wall and the Aluminum plastic Board curtain wall 4, and stone curtain wall 5, and curtain wall buried pieces 6, and light steel points type glass rain canopy, and aluminum Board rain canopy 7, and aluminum Venetian 8, and outdoor advertising (containing roofing and the State surface advertising) 9 to spring glass door 10, and concrete structure and curtain wall between of layer between, and around fire seal blocking 11, and anti-mine 12, and daughter wall top processing 13, and pan light ming, engineering of tie
您可能关注的文档
- 高一同步巩固练解析:第2章 第1节第1课时(新人教版必修1).doc
- 高一同步巩固练解析:第2章 第1节第2课时(新人教版必修1).doc
- 高一同步巩固练解析:第3章 第1节第1课时(新人教版必修1).doc
- 高一同步巩固练解析:第3章 第1节第2课时(新人教版必修1).doc
- 高一同步巩固练解析:第2章 第3节第2课时(新人教版必修1).doc
- 高一同步巩固练解析:第3章 第2节第1课时(新人教版必修1).doc
- 高一同步巩固练解析:第4章 第1节第1课时(新人教版必修1).doc
- 高一同步测试()物质的分类.doc
- 高一地理 必修第一次月考(含答案).doc
- 高一地理 上期理期末考试试卷 湘教版必修1.doc
最近下载
- 酸性水汽提装置技术改造分析.doc VIP
- 《临建标准化箱式房技术标准》2014.7.12印刷版.pptx
- 《电动汽车底盘测功机设计》-毕业论文设计(学术).doc
- 100以内加减法口算天天练_每页100题(打印版).docx
- 北京大学初党练习试题附答案.doc VIP
- 乌兰察布城规划管理技术规定.doc
- 品管圈PDCA案例-提高成人术后疼痛评估与护理规范率医院品质管理成果汇报.pptx
- ZTE中兴通讯股份有限公司企业战略管理分析报告.docx VIP
- 中国船级社规范 散装运输液化气体船舶构造与设备规范 2022(272).pdf VIP
- 基于微信小程序的中学校园管理系统的设计与实现.docx VIP
文档评论(0)