- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2 病毒协同进化遗传算法MPS
项目优化调度的病毒协同进化遗传算法(?
胡仕成1+, 徐晓飞1, 李向阳2
1(哈尔滨工业大学 计算机科学与技术学院,黑龙江 哈尔滨 150001)
2(哈尔滨工业大学 管理学院,黑龙江 哈尔滨 150001)
A Virus Coevolution Genetic Algorithm for Project Optimization Scheduling
HU Shi-Cheng1+, XU Xiao-Fei1, LI Xiang-Yang2
1(School of Computer Science and Technology, Harbin Institute of Technology, Harbin 150001, China)
2(School of Management, Harbin Institute of Technology, Harbin 150001, China)
+ Corresponding author: Phn: +86-451-6419787, E-mail: hu_shicheng@,
Received 2002-11-12; Accepted 2003-03-24
Hu SC, Xu XF, Li XY. A virus coevolution genetic algorithm for project optimization scheduling. Journal of Software, 2004,15(1):49~57.
/1000-9825/15/49.htm
Abstract: In this paper, a virus coevolution genetic algorithm (multi-mode project scheduling-virus co-evolution genetic algorithm, MPS-VEGA) for the precedence and resource constrained multi-mode project scheduling problem is presented, and the encoding of the solution and the operators such as selection, crossover, mutation and virus_infection are given. MPS-VEGA is used to obtain the optimal scheduling sequences and resource modes for the activities of the project so that the project cost is minimized, which can transmit evolutionary genes not only between parent and child generations vertically by the genetic operators but also in the same generation horizontally by the virus_infection operator so as to perform a global search and a local search, respectively. The schema theorem is adopted to analyze the performance of MPS-VEGA. The theoretical analysis and experimental results show that the MPS-VEGA outperforms the GA. For the multi-mode project scheduling problem with different optimization objectives, MPS-VEGA can simutaneously give standard the optimal scheduling sequences subject to the precedence constraints and the optimal resource modes for the activities of the project.
Key words: resource-constrained project scheduling; multi-mode; cost optimization; virus evolution; genetic algorithm
摘
您可能关注的文档
- 1.2014年下半年重点专项监管工作计划 .doc
- 资产负债表的配置.doc
- 资产负债表练习2.doc
- 1.2014年四川省高等职业院校信息化教学大赛方案 .doc
- 资产负债表英语词汇.doc
- 1.PVC涂塑防水布是以高强度的涤纶帆布为基布,涂敷聚氯乙烯(PVC.doc
- 1.GSM基本知识 .doc
- 资产负责表和利润表.doc
- 资产负债表的未分配利润的期末数为.doc
- 资产负债表相关比率.doc
- 4.4.1《化学式与化合价》第1课时(教学设计)(1).docx
- 专题04 自然界的水【好题汇编】备战2023-2024学年九年级化学上学期期末真题分类汇编(人教版)(原卷版).docx
- 专题01 走进化学世界【好题汇编】备战2023-2024学年九年级化学上学期期末真题分类汇编(人教版)(原卷版).docx
- 期末押题卷01-备战2023-2024学年九年级化学上学期期末模拟卷(广东专用)(解析版)(1).docx
- 第六单元 碳和碳的氧化物-2022-2023学年九年级化学上册期末单元复习教案(人教版)(学生版)(1).docx
- 期末押题卷01-备战2023-2024学年九年级化学上学期期末模拟卷(广东专用)(原卷版)(1).docx
- 1.课题1 第1课时 空气是由什么组成的(1).ppt
- 《化学式与化合价》第2课时教学课件(1).pptx
- 第四单元 自然界的水(选拔卷)-【单元测试】九年级化学上册尖子生选拔卷(人教版)(解析版)(1).doc
- 2023-2024学年上学期期末模拟考试01(人教版)(解析版)1(1).docx
文档评论(0)