Tender Evaluation Report and Guide for Works (386KB .docVIP

Tender Evaluation Report and Guide for Works (386KB .doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Tender Evaluation Report and Guide for Works (386KB

Standard Tender Evaluation Form and Evaluation Guide Procurement of Works August 2014 August 2013 Preface Procurement under projects financed by the European Bank for Reconstruction and Development (the Bank), is carried out in accordance with procedures laid down in the Bank’s Procurement Policies and Rules (the Rules). This Standard Tender Evaluation Form (STEF) has been prepared for use by the Bank’s public sector clients for contracts for Works financed from the proceeds of a loan from the Bank. Prior to the receipt of tenders, the client should appoint an Evaluation Committee (EC), which should include a Chairperson, which will be responsible for carrying out the evaluation and making an award recommendation for the consideration of the client’s management and the Bank. The EC should include experienced members having technical expertise relevant to the procurement in hand. Where the client’s staff does not have the necessary experience or expertise to carry out the evaluation on their own, the client should retain competent independent consultants to assist the EC. The purpose of the tender evaluation is to identify the most economically advantageous tender. The lowest evaluated tender is determined by applying the evaluation criteria which have been specified in the tender documents. The tender with the lowest evaluated cost, but not necessarily the lowest submitted tender price, shall be selected for award. It should be noted that it is the Bank’s client that is responsible for carrying out all procurement activities and decisions in accordance with the Bank’s Procurement Policies and Rules (the Rules). The Bank monitors the process and reviews critical documents and decisions to assure itself that the Rules are being followed. If the Bank determines that any procurement document, action or decision is not consistent with the Rules, it will inform the client and if the client fails to rectify the inconsistency, the

文档评论(0)

wuyuetian + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档