- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《一个歌手的情》吉他谱 周三
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1 pages of drawings and diagrams, maps; 2 a comprehensive understanding of drawing; 3 finding of design-driven dimensions , do not resize and adjust the size; 4 questioned the drawings; 5 develop buries a construction programme and technical clarification; 6 clear corners and special treatment; 7 controlled construction drawings to verify construction scheme and design. 2 at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. 3 identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1 to help determine the origin of curtain walls; 2 acceptance of the installation is accurate; 3 adjust errors, and determine the error range. 4 find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. 5 take level level : level minor works available in horizontal pipe , the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1 pages of drawings and diagrams, maps; 2 a comprehensive understanding of drawing; 3 finding of design-driven dimensions , do not resize and adjust the size; 4 questioned the drawings; 5 develop buries a construction programme and technical clarification; 6 clear corners and special treatment; 7 cont
您可能关注的文档
最近下载
- 农村公路养护预算编制办法.docx VIP
- 环境管理员求职个人简历求职简历大学生优秀简历模板.doc VIP
- 云南省农村公路养护工程预算编制办法(定稿2019.05.13).pdf VIP
- 2025年重庆市普通高中学业水平选择性考试11月调研测化学试卷及答案解析.docx VIP
- 财商夏令营创业策划书.pdf
- 历史丨2025年重庆市普通高中学业水平选择性考试11月调研测试卷历史试卷及答案.pdf VIP
- 离心泵设计计算表.xls
- 低压配电柜基础知识精选.ppt
- 2025年保安员上岗证初级保安员考试题及答案(精选5套) .pdf VIP
- 政治丨2025年重庆市普通高中学业水平选择性考试11月调研测试卷政治试卷及答案.pdf VIP
文档评论(0)