网站大量收购独家精品文档,联系QQ:2885784924

毕业设计(论文)-大屯路公交与地铁换乘车站深基坑维护设计毕业设计.doc

毕业设计(论文)-大屯路公交与地铁换乘车站深基坑维护设计毕业设计.doc

  1. 1、本文档共91页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
论文题目: 大屯路公交与地铁换乘车站深基坑维护设计 专 业:土木工程(岩土工程) 学 生: (签名) 指导老师: (签名) 摘 要 根据《》m,深约17m,同时参考当地的建筑经验和施工现场的具体情况,完成了大屯路公交与地铁换乘车站深基坑维护的方案论证和设计。降水方案为深井降水,支护方案采用土钉墙、排桩、内支撑联合支护。基坑开挖方式为分步、分段、分层开挖。在开挖的同时对基坑进行监测,监测的内容包括桩体变形、桩身内力、支撑轴力。得出结论:桩顶水平位移反映支护结构的顶部变形情况,是支护结构安全状况的重要指标,且在有支撑作用的情况下支护变 形最大。最后,根据施工方案对工程进行了施工组织设计。 关键词: 深基坑,支护方案,土钉墙,排桩,钢支撑,开挖方式,变形监测, 施工组织 类 型: 研究型 Subject : Deep foundation pit retaining Design of Beijing subway stations and bus transfer station Specialty : Civil Engineering (Geotechnical Engineering) Name : (Signature) Instructor : (Signature) ABSTRACT In the thesis, based on 《The Geotecnical Engineering Investigation Report Of Beijing subway stations and bus transfer station》, the length of station of Beijing subway stations and bus transfer station is 101.1m, the width of foundation pit is about 26m and the depth of foundation pit is approxomately 17m. Simultaneously, refer to the local construction experience and special details of constraction site, that plan testify and design of deep foundation pit retaining of Beijing subway stations and bus transfer station has completed. The plan of retaining adopts soil-nail wall,line-pile,steel props to retain together. The type of excavation adopts a way for the minute step,the partition,the lamination excavates. While excavating foundation pit, foundation pit monitoring is carrying on, including pile deformation, pile interal force, inner axial force. The study shows the deformation characteristics of supporting structure is related to the horizontal displacement of the retaining pile top, which is the important criterion of the safety of condition of supporting structure. With the effect of supporting structure, the deformation is the largest . Finally, according to construction scheme, the construction organization design has been finished. Key Words: deep foundation pit; retain

文档评论(0)

***** + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档