海外工程脚手架搭拆除施工方案范本

METHOD STATEMENT FOR SCAFFOLD ERECTIOIN DISMANTLING INTRODUCTION : This procedure highlights the MMG work procedure for the erection dismantling of scaffolds. Execution of the work shall be in accordance with relevant project specifications REFERENCES : ANSI A10.8 : Scaffolding Safety Requirements ANSI A14.2 : Ladders, Portable Safety Metal Requirements ASTM A53 : Standard Specification for Pipe, Steel, Black Hot Dipped Zinc Coated, Welded Seamless ASTM A123 : Standard Specification for Zinc (Hot-dipped Galvanized) Coating on Iron Steel Products ASTM A