electricl installation project
electrical installation project. The contract has been widely used in China.
(7) professional engineering contracting mode
Divided into various professional mechanical and electrical engineering contracting. Subcontracting mostly adopt this model.
The contractor is only responsible for the engineering construction quality of the contracted.
Three, the bid opening and bid evaluation management requirements
(a) the bid opening
1. The bid opening shall be heard in public. The bid opening time should be submitted with the tender documents deadline at the same time in public.
(2) of the evaluation and selection
(1) of the bid assessment committee. General representative by the tenderer and experts in aspects of technology, economy, the number of its members into five
More than singular. Including technology, economy and other experts shall be not less than two-thirds of the total number of members. Experts from hiring by the tenderer
The agency expert database or the country, the peoples governments of provinces, municipalities directly under the central government provide the experts randomly selected in the list, special project subject to tender
Can be determined by the tenderer directly.
4. Effective standard. Open, the evaluation process, effective in less than three tender, the tender is invalid, should be tender anew.
1 h420032 bidding for construction conditions and procedures
A condition, bidding should possess
1. The project shall fulfill the formalities for examination and approval and approval;
2. Have corresponding money or funding has been implemented, and truthfully in his tender documents.
3. The tenderer has been established according to law;
4. The examination and approval formalities of preliminary design, and has, and has set up a approval;
5. Scope of bidding, bidding and tendering organization have approval formalities, and has been approved;
6. A tender design drawings and technical data as needed.
Four, has one of the followin
您可能关注的文档
- C语言程序设计上考试题目汇编.doc
- C语言程序设计复大纲2009.doc
- C语言程序设计期复习题(48学时).docx
- C语言程序设计期复习资料版.doc
- C语言程序设计练题第2 3部分答案.doc
- C语言程序设计课教学大纲 1.doc
- C语言程序设计课设计指导书.doc
- c语言程序调试中误或警告提示的中文对照.doc
- C语言简单查找排方法及代码.doc
- c语言练习册答案.doc
- 第18讲 第17课 西晋的短暂统一和北方各族的内迁.docx
- 第15讲 第14课 沟通中外文明的“丝绸之路”.docx
- 第13课时 中东 欧洲西部.doc
- 第17讲 第16 课三国鼎立.docx
- 第17讲 第16课 三国鼎立 带解析.docx
- 2024_2025年新教材高中历史课时检测9近代西方的法律与教化含解析新人教版选择性必修1.doc
- 2024_2025学年高二数学下学期期末备考试卷文含解析.docx
- 山西版2024高考政治一轮复习第二单元生产劳动与经营第5课时企业与劳动者教案.docx
- 第16讲 第15课 两汉的科技和文化 带解析.docx
- 第13课 宋元时期的科技与中外交通.docx
文档评论(0)