Inspection Chad and test all meter and relay action is correc2.docVIP

  • 0
  • 0
  • 约 5页
  • 2016-11-22 发布于河南
  • 举报

Inspection Chad and test all meter and relay action is correc2.doc

Inspection Chad and test all meter and relay action is correc2

Inspection Chad and test all meter and relay action is correct. (3) sending acceptance 1. The power supply departments inspection qualified to send power supply to the interior, after check the electricity, the school is correct. 2. High voltage into the line switch, check whether the high voltage is normal. Transformer tank switch, to check whether there is electric transformer and low voltage into line switch, check the low voltage is normal. In other ark switch respectively. 3. The no-load running 24 h, no abnormal phenomenon, the acceptance formalities, the construction unit to use. Submitted at the same time the construction drawings, construction records, product certification specification, test report and other technical information. 1 h413022 transformer installation technology A, basis of acceptance Transformer in place before, first carried out on the basis of acceptance. Foundation should comply with the design requirements, the center and the elevation of track and wheel base should be consistent with each other, the specific requirements: orbital level error should not be more than 5 mm. The actual gauge gauge should not be less than design, error should not be more than 5 mm. Rail face design elevation error should not be more than plus or minus 5 mm. Second, the equipment out of the examination 1. When unpacking the case, according to the equipment list, check the transformer equipment technical documents and construction drawings specifications should be consistent with the design, accessories and spare parts is complete without damage. 2. The transformer appearance inspection without mechanical damage and deformation, paint in good condition, no rust. 3. The tank seal should be good, with transformer oil transportation, oil conservator oil level should be normal, the oil should be no leakage. 4. Insulation porcelain and epoxy resin casting without damage, defects and cracks. 5. Filling nitrogen or transformer dry air transportation, du

文档评论(0)

1亿VIP精品文档

相关文档