Power_ON_OFF.pptVIP

  • 12
  • 0
  • 约4.78千字
  • 约 9页
  • 2016-11-22 发布于河南
  • 举报
Power_ON_OFF

Ph. Druart Different levels of Reset System ON/OFF Operation and configuration INNOVA 2000 System ON OFF System ON/OFF Operation and configuration Emergency OFF Button on wall PDB VAMP Manual Breaker Advantx console ON/OFF green button ASC Titan Standby Switch (MUST be kept in OFF position) ON/OFF buttons Breakers VAMP Cabinet Postit Cabinet Elements involved in the System ON/OFF Operation Note : The Titan Standby switch located below the ASC floppy drive must always be on the “O” position (OFF) How to power ON the system starting from room completely switched OFF 1) Verify that the wal

文档评论(0)

1亿VIP精品文档

相关文档