项目改造施工方案中英文版

糖厂1×45t/h CFB锅炉改造方案 The Upgrade Project of 1×45 t/h CFB Boiler 一 工程概况: 1. Project Overview 本项目为一台1×45t/h CFB锅炉改造,其主要工程项目为:更换二次风机,引风机;对锅炉二次风管部分管道进行改造,增加二次风管风门调节阀,送料风调节阀,密封风调节阀,圆形碳钢给料管改为方形不锈钢给料管,螺旋给料机检查门改为快开式; This project is a renovation of 1 × 45t/h CFB boiler, and its main projects are as follows: to replace the secondary fan and induced-draft fan; to transform partial pipeline of boiler secondary air duct, to increase the throttle valve of secondary air duct, throttling valve of both the feeding airflow and the sealing airflow, to change the feeding pipe from round carbon-steel into