- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
backfill imediately
backfill immediately. Meantime if a pipe deformation is bigger, endanger the pipeline safety, take line bottom grouting treatment, (at the edge of the line below the 5 meters to 45 ° to drilling pipe grouting, at the same time please monitoring unit observation pipe deformation situation at any time, until the line is stable.
B. 2 facility protection measures on the ground
The ground facilities, such as the high tension line, walls, etc., according to the actual situation and the related units to contact, to take protective measures, to ensure the smooth progress of construction. Projects under construction (including the scaffolding) of the lateral edge and the edge of an electric overhead line, as well as the transformer into the line between, must keep a safe distance. Can not meet the specified minimum distance, protective measures must be taken. When the erection or dismantling protective measures, must be a power outage, by a qualified scaffolder build-up, electrical technicians or full-time technical staff responsible for monitoring. The transformer with a wooden foot hand made barrier and federated eye network, marked with electric shock, dangerous, no climbing and other words.
Before on the surrounding buildings make actual survey, excavation of the original building height are identified, with level control during excavation observation buildings there are any changes, if there are any changes in time for party a, supervision, design units consultations and take corresponding measures.
C construction technical scheme and measures
C. 1 alignment measurement
1, according to the construction unit to provide urban plane control network and city level node location, number, precision grade and its coordinates and elevation data and to determine the heating pipe network line and elevation.
2, heat supply pipeline engineering construction alignment measurement should meet the following requirements:
1) should be according to the order of the trunk, trun
您可能关注的文档
- ARCGIS教程第七 栅格数据生成和显示.doc
- Assignment(I) of Quality Assurance and Quality Control_2_final.doc
- Asada Millng Co., Ltd.doc
- ASME(美国机械工师协会) 常用词汇.doc
- Asymmetriceffects of monetary policy in Brazil.doc
- ATB-25沥青碎石层在麻武高速中的应用.doc
- ATCC标准菌株以及CTC菌株列表.doc
- ATP的主要来源-细呼吸教学设计.doc
- Atomix Virual DJ 完全攻略教程.doc
- AssignmentII_environmental management and conservation 2.doc
最近下载
- 某电解车间电解槽制作安装施组设计.doc VIP
- (完整word版)企业知识产权管理制度.docx VIP
- (TS-VD-131-00)鱼腥草生产工艺验证方案及报告.doc VIP
- 300T汽车吊主臂起重性能表.docx VIP
- 2025年担保专员招聘面试参考试题及答案.docx VIP
- 高盛中国股票五年计划推介高盛第十五个五年计划投资组合Goldman Sachs-Your 5~Year Plan in China Equities-Introducing GS 15th FYP Portfolio.pdf VIP
- 发电厂凝结水精处理技术资料.ppt VIP
- 2025陕西建工投资集团有限公司招聘(6人)笔试参考题库附带答案详解.doc
- 水泵安装安全技术交底.docx VIP
- Haier海尔冰箱BCD-328WDGF说明书使用安装手册参数图解图电子版.pdf
原创力文档


文档评论(0)