glass curtin wall engineering
glass curtain wall engineering (JGJ102) rules.
2, the model of full glass curtain wall and facade frame should comply with the design requirements, and coordinate with original frame curtain wall model and facade.
3, full glass curtain wall engineering use of glass shall meet the following requirements:
Safety should be used (1) full glass curtain wall glass, glass varieties, specifications, color, optical performance and installation direction should comply with the design requirements.
(2) full glass curtain wall panel glass thickness should not less than 10 mm; Laminated glass single chip thickness should not be less than 8 mm; Glass rib section thickness should not less than 12 mm, cross section should be not less than 100 mm.
(3) full glass curtain wall of the hollow glass should adopt double seal, which should be adopted double seal structure of silicone sealant and butyl hot-melt sealant seal. Coating surface should be 2 or 3 of the hollow glass surface.
(4) the full glass curtain wall of laminated glass should be used polyvinyl butyral (PVB) film dry processing composite laminated glass.
(5) full glass curtain wall with toughened glass should be treated with hot dip, prevent the glass from the explosion. Toughened glass surface can not have damage.
(6) of full glass curtain wall glass edge should be edge grinding and chamfering processing.
4, full glass curtain wall accessories shall be complete and comply with the design requirements, curtain wall and the main structure of the connection should be solid and reliable. The number of attachments, specification, location, connection method and anticorrosive processing shall meet the design requirements.
5, more than 4 m of full glass curtain wall should be hanging in the main structure, supporting device and should comply with the design requirements of the hanging type glass curtain wall support device (JG139).
Six, full glass curtain wall should be no leakage.
7, full glass curtain wall, glass and
您可能关注的文档
最近下载
- 浅析党和国家领导人教师思想与“育师为本”理念.doc VIP
- 经史子集国学文库:子部·儒家·龙溪王先生全集.pdf
- 人教版八年级上册语文《台阶》配套练习册参考答案.doc VIP
- 附件2-新冠鼠疫流行病学调查表.docx VIP
- 应急救援员(五级)理论考试题库(含答案).docx
- 2024国网陕西电力省管产业单位供电服务业务部招聘(379人)高频考题难、易错点模拟试题(共500题)附带答案详解.docx
- 全国大学生市场调查与分析大赛调查研究报告.PDF
- 创新与发明---按图索骥、循章创新智慧树知到期末考试答案2024年.docx
- 商用车智能底盘产品平台定义-2023-07-商用车.pdf VIP
- 良好的健康与福祉.PDF
文档评论(0)