航海英语阅读关联题(57篇)学习笔记.docVIP

  • 61
  • 0
  • 约13.84万字
  • 约 41页
  • 2016-11-23 发布于江苏
  • 举报
Passage 01 An aircraft lift on board RFA Argus was loaded beyond its safe working load of 18.4 tonnes. There were no injuries to any personnel,or material damage to the ship or its equipment. During a planned stay in port,500 compressed CO2 cylinders were required to be landed. These were normally stowed on a lower deck and needed to be transferred to the weather deck before being taken ashore. Before the vessels arrival in port,the planned operation was discussed between various officers and senior ratings,one of whom was to supervise final discharge of the cylinders from the ship. Once in po

文档评论(0)

1亿VIP精品文档

相关文档