IPQA (In-Process Quality Assurance).pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
IPQA (In-Process Quality Assurance).ppt

IPQA (In-Process Quality Assurance) First Article Inspection(FAI) Sampling Inspection Patrol Inspection FAI Check two PCBAs when producing another model. Refer to: BOM, ECN/EC, Layout, Weekly Produce Plan Inspection Station: SMT Bonding MI PCBA Packing Sampling Inspection Inspection method: 1. General product for SMT: AQL Standard: ANSI/ASQZ1.4-2003 General Inspection Levels II Class. AQL: 0.65. Acceptable Standard: ≦400 PPM with IPC-A-610D Class II. 2. General product for Bonding: AQL Standard: ANSI/ASQZ1.4-2003 General Inspection Levels II Class. Acceptable Standard: MAJOR 0.65, MINOR 2.5. 3. General product for PCBA: AQL Standard: ANSI/ASQZ1.4-2003 General Inspection Levels II Class. Acceptable Standard: MAJOR 0.65, MINOR 2.5 with IPC-A-610D Class II. Inspection Station: SMT Bonding MI PCBA (Only for semi-product shipped by PCBA) Patrol Inspection-1 SMT Process: Measure solder paste viscosity Check refrigerator temp Check BGA/LGA/QFN soldering with 3D X-Ray, 5pcs/hour; Check PCBA workmanship, 5pcs/2 hour; Follow up ECN/EC ; Bonding Process: Measure temp of silver epoxy stored at refrigerator; Check Bonded IC workmanship,2pcs/day; Follow up ECN/EC; Patrol Inspection-2 MI Process: Measure the pre-heat temp, solder pot temp and flux density Check worker’s operation in accordance with the MEI/TEI requirement. Check PCBA workmanship, 5pcs/2 hour. Follow up ECN/EC. Assembly Process: Check worker’s operation in accordance with the MEI/TEI requirement. Check PCBA workmanship, 5pcs/2 hour. Follow up ECN/EC. Verify the test software. Verify the Mac address, S/No. information. Verify all kinds of labels’ content and printing quality. Gather data for SPC control ( Xbar-R Chart, P chart) Sampling Inspection OQA using the following plan for their sampling inspection if customer has not special requirement: AQL Standard: ANSI /ASQ Z1.4, Single Sampling Plan, Normal Inspection, Level II

文档评论(0)

tangtianxu1 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档