- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
国外滨水开发波士顿 Boston big dig
* Boston Big Dig-Background The problems Boston, Massachusetts had a world-class traffic problem, an elevated six-lane highway called the Central Artery that ran through the center of downtown. When it opened in 1959, the Central Artery comfortably carried about 75,000 vehicles a day. It has carried upwards of 200,000, quite uncomfortably, making it one of the most congested highways in the United States. And traffic wasnt the only problem the old Central Artery caused in Boston. The elevated highway (which displaced 20,000 residents when it was built) also cut off Bostons North End and Waterfront neighborhoods from the downtown, limiting these areas ability to participate in the citys economic life. Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd. Boston Big Dig - Solutions The projects two major components: Replacing the six-lane elevated highway with an eight-to-ten-lane underground expressway directly beneath the existing road, culminating at its northern limit in a 14-lane, two-bridge-crossing of the Charles River. After the underground highway opened to traffic, the crumbling elevated was?demolished and in its place?will be?open space and modest development. The extension of I-90 (the Massachusetts Turnpike) from its former terminus south of downtown Boston through a tunnel beneath South Boston and Boston Harbor to Logan Airport. The first link in this new connection?- the four-lane Ted Williams Tunnel under the harbor?- was finished in December 1995. The new bridge replaced a deteriorating six lane double-deck bridge that was demolished in spring 2004. Evaluation only. Created with Aspose.Slides for .NET 3.5 Client Profile 5.2.0.0. Copyright 2004-2011 Aspose Pty Ltd. The .75-mile underwater part of the 1.6 mile tunnel was built using a dozen steel tube sections, each longer than a football field, that were sunk into a trench on the Boston Harbor floor and connected together The u
原创力文档


文档评论(0)