- 1、本文档共29页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
§8 Bridge Design and Construction桥的设计与建造 1. New words analysis accessory= access(increased)ory Derrick=from Derrick, the surname of a London hangman Debris=orign early 18th cent.: from French débris, from obsolete débriser ‘break down’ Planning. The first step leading to the construction of a modern major bridge is a comprehensive study to determine whether a bridge is needed. 规划设计 现代重要的桥梁建造的第一步是广泛地研究以确定桥梁的必要性。 If it is to be a highway bridge, in the United States for example,a planning study is initiated by a state bridge authority,possibly in cooperation with local government or the federal government . 比如:如果是美国的高速公路桥,是由州桥管理局研究规划并确定,同时当地的政府或联邦政府一起参与。 Studies are made to estimate the amount of bridge traffic, the relief of jammed traffic in nearby highway network, the effects on the regional economy, and the cost of the bridge. 桥梁的交通流量、对附近高速公路网交通堵塞的调剂,对当地经济的影响和桥的造价等因素进行评估研究。 The means for financing the project, such as public taxes or sale of revenue bonds repaid by toll charges, are considered. Bond n.结合(物), 粘结(剂), 联结, 公债, 债券, 合同 revenue bond收益债券 这就决定了工程的投资方式,如公众收费,依靠过通行费来支付的发行债券的规模都要被考虑进来。 If the studies lead to a decision to go ahead with the project, the land needed for the bridge and its approaches is acquired at the selected site. 如果研究认为其可行信,那么桥选址和占地问题将着手处理。 At this point, field engineering work is started. Accurate land surveys are made. land survey 土地测量 在确定场地时,现场测绘工作开始进行,做好精确的实地测量。 Tides, flood conditions,currents, and other characteristics of the waterway are carefully studied. 潮汐,洪水因素,水流和排水的其它的特征都要仔细研究, Boring samples of soil and rock are taken at possible foundation locations, both on land and under the water. 在陆地和水下的泥土和岩石的钻孔取样在基础可能的位置都要尽可能地进行。 Selection of bridge design.桥梁设计类型的选择 The chief factors in deciding whether a bridge will be built as a girder , cantilever , truss , arch , suspension , or some other type are: (1) locat
您可能关注的文档
- 优化方案高考化学二轮专题复习广东专用专题一基本概念第4讲.ppt
- 小学教育教学管理常规30条.ppt
- 历史大象高三复习课件宋明理学及明清之际儒学的发展.ppt
- 历史学测复习人教必修第一单元.ppt
- 历史宋明理学课件人民必修三.ppt
- 土木专业英语概述.ppt
- 科普版英语小学五年级上lesson3 A computer has a keyboard..ppt
- 提高大截面框架柱观感质量0704121.ppt
- 土木工程专业论文答辩例.ppt
- 提高政企客户故障预处理成功率.ppt
- 2024浙江衢州市常山县“英才荟”事业单位紧缺急需人才招聘18人笔试备考试题及答案解析.docx
- 2024浙江省近海海洋工程环境与生态安全重点实验室招聘1人笔试备考试题及答案解析.docx
- 2024广东阳江市阳西县补充招聘森林消防应急队员5人笔试备考试题及答案解析.docx
- 2024浙江松阳县新华书店有限公司招聘见习大学生1人笔试备考试题及答案解析.docx
- 2024云南曲靖市马龙区部分事业单位选调(含选调计划)26人笔试备考试题及答案解析.docx
- 2024广西柳州市残疾人劳动就业服务中心招聘残疾人专职委员1人笔试备考试题及答案解析.docx
- 2024广西河池市总工会公开招聘社会化工会工作者3人笔试备考试题及答案解析.docx
- 2024贵州华贵人寿保险股份有限公司第三次社会招聘15人笔试备考试题及答案解析.docx
- 2024广西百色市田东县5月城镇公益性岗位工作人员招聘4人笔试备考试题及答案解析.docx
- 2024广西百色市那坡县坡荷乡人民政府公开招聘编外工作人员2人笔试备考试题及答案解析.docx
文档评论(0)