- 1、本文档共59页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
International Trade Terms GROUP C Group C: Main Carriage Unpaid CFR Cost and Freight 成本加运费 CIF Cost Insurance and Freight 成本、保险费加运费 CPT Carriage Paid To 运费付至 CIP Carriage Insurance Paid To 运保费付至 COST AND FREIGHTCFR(…named port of destination) Incoterms? 2010 The seller delivers the goods on board the vessel or procures the goods already so delivered (确保货物已如此装运). The risk of loss of or damage to the goods passes when the goods are on board the vessel. COST AND FREIGHTCFR(…named port of destination) Incoterms? 2010 The seller must contract for and pay the costs and freight necessary to bring the goods to the named port of destination. CFR 成本加运费Cost and freight(…named port of destination) 3)Costs of the Seller Case Study: 某公司按CFR贸易术语与法国马赛一进口商签订一批抽纱台布出口合同,价值8万美元。货物于1月8日上午装“昌盛轮”完毕。业务员当天因经工作繁忙,待到9日上班时才想起给买方发装船通知。法商收到我装船通知向当地保险公司申请投保时,该保险公司已获悉“昌盛轮”已于9日凌晨在海上遇难而拒绝承担。于是法商立即来电表示该批货物损失应由我进出口公司承担并同时索赔8000美元,且拒不赎单。我方钱货两空的教训实值得吸取。 Case Study COST INSURANCE AND FREIGHTCIF(…named port of destination) Incoterms? 2010 Only for sea and inland waterway transport Place of delivery Contract of carriage Unloading expenses CIF: Cost Insurance and Freight (…named port of destination)成本、保险费加运费 Contract of Insurance The seller also has to procure marine insurance against the buyers risk of loss of or damage to the goods during the carriage. CIF=CFR + I 风险划分的问题 Case Study A Chinese exporter exported 500 M/T walnut to a Canadian importer on the basis of USD 4800 per M/T CIF Quebec. As it was a seasonal commodity, the importer required and both parties agreed to stipulate the following in the contract. L/C Issuing Date: to be issued by the end of September. Shipment: Not later than Oct.31, partial shipment and transshipment prohibited. Arrival Date: Not later than Nov.30. Otherwise, the buyer is entitled to refuse the goods. Terms of Payment: Draft at 90T/D under L/C. Due to the weather, the liner arrived at Quebec on Dec.5. Co
您可能关注的文档
- 2009年考英语完形填空专项复习含答案与解题思路一.doc
- 2009真卷三.doc
- 2009提课文句子翻译.doc
- 2009年考英语二轮专题复习研讨课件——短文改错.ppt
- 2009行法试题.doc
- 2010-011学年第二学期《民法学》试卷A.doc
- 2009年理工程师考试建设工程合同管理试卷.doc
- 2010-011学年第二学期大学英语教学计划与安排.doc
- 2010-2学生复习题.doc
- 2010.7英美文学试题答案.doc
- 数据仓库:Redshift:Redshift与BI工具集成.docx
- 数据仓库:Redshift:数据仓库原理与设计.docx
- 数据仓库:Snowflake:数据仓库成本控制与Snowflake定价策略.docx
- 大数据基础:大数据概述:大数据处理框架MapReduce.docx
- 实时计算:GoogleDataflow服务架构解析.docx
- 分布式存储系统:HDFS与MapReduce集成教程.docx
- 实时计算:Azure Stream Analytics:数据流窗口与聚合操作.docx
- 实时计算:Kafka Streams:Kafka Streams架构与原理.docx
- 实时计算:Kafka Streams:Kafka Streams连接器开发与使用.docx
- 数据仓库:BigQuery:BigQuery数据分区与索引优化.docx
文档评论(0)