- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Project Procedure Manual
Rev Date Description Prepared Checked Project Manager Client
Disclaimer
This document has been prepared on behalf of and for the exclusive use of GASAN, and is subject to and issued in accordance with the agreement between GASAN and SAMI. The information in this document may not be disclosed to, or used by any other party without SAMI’s prior written consent.
184. Hepingbei Street Shenyang, LN 110001 P.R.China
Tel: +86-24Fax: +86-24Shenyang Aluminum Magnesium Engineering Research Institute Company Ltd.
Table of Contents
1 EXECUTIVE SUMMARY 1
1.1 Staff Force Mobilization 1
1.2 Kick-off Meeting 1
1.3 Project Status 1
1.4 Payment 1
1.5 Key Issues and Areas of Concern 1
2 TECHNICAL QUERY 3
3 ENGINEERING 4
3.1 General 4
3.2 Achiedved This Month 4
3.3 Planed Next Month 4
4 PRICE QUOTATION 6
5 PHASE II IMPLEMENTATION PLAN 6
6 OPEN BOOK ESTIMATE 6
7 CDRL 6
文档管理部分
2 Types of documentation
2.1 Technical Documents of Project
2.1.1 Project drawings
2.1.2 Project technical documents
2.1.3 Standardized documents
2.1.4 External drawings and documents
2.2 Non-technical Documents of Project
2.2.1 Correspondence
2.2.2 Management documents
2.2.3 Commercial documents
2.3 Procedure, Planning, Instructions and Statements of Projects
3 Project Document Numbering Format
3.1 Numbering Format
N refers to numeric character and A refers to alpha.
3.2 Document Numbering Elements Explanation
3.2.1 Prefix and Project Number
Alpha character
S = SAMI
E = External (Supplier-Contractor-External Consultant)
CAS = CHALIECO
Six numeric characters (NNNNNN),prepared by the Project Management Department,or same as the Project Number for the preliminary project
e.g. CAS1117 represents GASAN CPC Project
.2.2 Plant Area and Package Number
One alpha and three numeric characters (NANN) identified as part of plant
The first numeric character represents the Project Type, refer to Ap
您可能关注的文档
最近下载
- 第8课 隋唐政治演变与民族交融-【中职专用】《中国历史》魅力课堂教学课件(高教版2023•基础模块).pptx VIP
- 人力资源管理开题(课题背景研究目的与意义【最新】.docx VIP
- 《生产调度与控制实务》课件.ppt VIP
- 2025水电工程信息分类与编码第4部分:水工建筑物.docx
- PMP项目管理培训课件项目.pptx VIP
- xx公司集团中铁工程部内部管理制度.doc VIP
- 2025年汽车驾驶员技师资格证书考试及考试题库含答案.docx
- 盐酸普鲁卡因工艺说明书8.pdf VIP
- 外研版小学三年级的英语第一单元试题.doc VIP
- 经济学原理(第8版)微观经济学曼昆课后习题答案解析.pdf
文档评论(0)