- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2-5 truss Check all the trusses against dwg to see if there’s any damage or fragment. Contact with manufacturer in case of any problem found with the truss to avoid any structural problem on the product. Damaged trusses (photo left) should not be used and reported to the truss fabricator for a resolve Quality issues (photo right) should be reported to the truss fabricator for a resolve Under no circumstance is a truss to be cut. Cutting reduces the integrity * Metal connector tie is a common practice installed in addition to nailing * Alternative type of connector tie * 3 generated reports: Engineering (e.g for the Design Institute and Inspectors); Production (or “shop”) along with an enlarged drawing showing plate positioning An example of another type of truss manufacturing equipment called a “C-Press” (Clamp Press) * Be sure this is enough space for proper truss storage. Keep trusses covered with tarps and away from soil And supported at all joints Zhabei the building image from GTGP 11 illustrated as stud framed ready for the application of wall sheathing (OSB as shown in the photo lower right) Exterior walls are 2x6 (bearing) and the interior walls are 2x4 (non-load bearing) Exterior walls fully sheathed; measurements for truss locations to start from 2 sides (in accordance with the truss layout drawing) Measurements always taken from face-of-stud (not the sheathing) Follow the truss placement layout drawing for truss locations and mark location and truss label on top of the plate Note: exterior walls MUST BE BRACED before loading trusses on top of the walls! first truss is the Gable (braced) and followed with one Common truss and secured in-place with 2x4 Lookout blocking (explain “Gable Overhang” and see next slide); Common Girder is necessary to position in order to support Common trusses as there is no bearing wall or support beam (Girder is designed as a 3 ply in order to support the intersecting trusses); and other Gable end can be started (also braced)
文档评论(0)