网站大量收购独家精品文档,联系QQ:2885784924

Cavity Development for RIA FermilabRIA腔发展费米实验室.ppt

Cavity Development for RIA FermilabRIA腔发展费米实验室.ppt

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Enter presentation date [Your Presentation Title] Test Joint ANL/FNAL Cavity Surface Processing Facility Why Build a Joint Cavity Processing Facility? Participants: Fermilab BCP at the Joint Processing Facility ANL Prototype Cavities for RIA 0.1b0.8 Background Construction and operation is jointly funded by Argonne and Fermilab Location: Argonne National Laboratory, Building 208, B101 (2000 ft2 high-bay) 2005 is the final year of a 3 year construction phase Capital cost: ~$1 million ANL funding from the laboratory director’s discretionary funds (LDRD) Fermilab funding from lab discretionary funds A Joint ANL/FNAL Cavity Processing Facility Layout, Design and Principal Areas Layout: ANL/FNAL Cavity Processing Facility Phase I: The Joint ANL/FNAL Chemistry Facility Chemistry Room Hardware Fermilab BCP Apparatus Facility Status: Chemistry Rooms External structure complete (Fall 2004) Internal hoods and ductwork largely complete A preliminary test of a Fermi BCP apparatus complete; this hardware will be reassembled shortly at ANL Memorandum of understanding to be drafted (May 2005) - Operations and maintenance of the facility Safety documentation to be drafted and presented to ANL safety (May 2005). This will be done separately for each laboratory A full ANL safety committee review of ANL operations summer 2005 followed by an ANL safety committee review of FNAL operations Full chemistry room operations are planned for fall 2005 (by ANL) and for early 2006 (by FNAL) Facility Status: Clean room, water system Ultra pure DI water system contract will be awarded (May 2005) Mezzanine and floor preparation out for bids; complete in June 2005 Clean room bid package is complete; potential contractors are identified Clean room construction scheduled for August 2005 Summary comments: The new Joint Cavity Processing Facility will Pioneering Science and Technology Office of Science U.S. Department of Energy ACC Review May 10-12, 2005 Michael

文档评论(0)

zyzsaa + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档