timelimitforaproject..docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
timelimitforaproject.

time limit for a project? Explain the reasons. The host equipment to 10 days later, will affect the total time limit for a project, Reason: because the job is on the key lines. Control equipment to 10 days later, will not affect the total time limit for a project, Reason: because the job is in a non-critical lines, a time of 55 days. 5. Engineering according to the contract time limit for a project is completed, where several installation company should work out? Installation company complete period as agreed in the contract, and shall be installed on the host, debugging and commissioning work out for 10 days. Case 2 Background: A construction unit (party a) and a construction unit (party b) to conclude a project construction contract. Stipulated in the contract: Unit price contract, the amount of each component project increase or decrease more than 10%, the need to adjust unit price of the project. The contract time limit for a project for 25 days, time limit for a project 3000 yuan for every 1 day in advance, for every 1 day after fine of $5000. Party b timely submit the construction network schedule plan before construction Row, as shown in the figure and to get the approval from party as representative. Engineering construction in the following several events: Event 1: construction site power outages caused by party A to provide power failure, reduce job A and Bs work efficiency, operation time points Dont delay 2 days and 1 day; Multi-purpose artificial eight and ten man-days. Work A lease of construction machinery rental fees for 560 yuan A day, The work Bs own machinery depreciation cost 280 yuan every day. Event 2: in order to ensure the construction quality of party a, party b will work in construction of C in the original design size, increase the volume of 16 m3, the work All cost unit price is 87 yuan/m3, homework time 2 days. Event 3: due to the design change, the amount of work E increased by 300 m3 to 300 m3, the job is the origina

文档评论(0)

gangshou + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档