- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Underinternalpressuresteelpipeandnonferrousmetalpipetestpressureshallbe1.
Under internal pressure steel pipe and nonferrous metal pipe test pressure shall be 1.15 times of design pressure, vacuum pipe test pressure shall be 0200000 mpa.
2. The test should be equipped with pressure relief devices, the set pressure shall not be 1.1 times higher than the test pressure.
3. Before the test, the application of air test, the appropriate test pressure of 0.2 million mpa.
4. Test, it shall gradually increase the pressure, when pressure rose to 50% of the test pressure, such as no abnormalities are found or leak phenomenon, according to 10% of the test pressure booster, step by step per voltage level for 3 minutes, until the test pressure. Should be regulated under test pressure for 10 minutes, and then the pressure drop to design, qualified for foaming agent inspection does not leak.
(6) the implementation of the pipeline leak test points
Leak test is based on the gas test medium, under the design pressure, using foaming agent, chromogenic agent, gas molecular sensing instrument or other means to check the leak test in the piping system. Implement key points are as follows:
1. Transportation extremely and highly harmful medium and combustible medium pipeline, leak test must be conducted.
2. The leak test should be performed after the pressure test, the test medium appropriate USES air.
3. The leakage test pressure for the design pressure.
4. The leakage test can be combined together.
5. Leak test should be step by step slowly booster, when reach test pressure, and pressure after 10 minutes, adopt the method of besmear brushs neutral foaming agent inspection tour, leak test check the focus is on valve stuffing box, flanged or threaded connection, emptying valve, exhaust valve, drain valve etc. All seal leaks.
(7) the implementation of the pipeline vacuum test points
Vacuum test for piping system of pumping air into vacuum state, make the internal form a negative pressure pipeline system, to pipeline system of pressurization rate within
您可能关注的文档
- ug装配功能详解..doc
- UG螺母螺栓建模及装配..doc
- UHB型耐腐耐磨砂浆泵..doc
- UG草图模式(Sketch)..doc
- UHF局部放电传感器..docx
- uip_process流程..doc
- UL1026标准--中文版..doc
- ukulele基本功..doc
- UL1082中文..doc
- uj41sm柱塞截止阀..doc
- Unit 1 Women of achievement..doc
- Unit 4 Making the News..doc
- Unit 14 I remember meeting all of you in Grade7...doc
- Unit 8 The seasons and the weather..doc
- Unit 6 Women, Half the Sky..doc
- Unit1-12词组(已完结)..doc
- Unit10continuallearning..doc
- Unit10HowcanIimprovemyEnglish..doc
- Unit10vocabulary..doc
- Unit10Iamgoingtobeabasketballplayer..doc
文档评论(0)