The secret to good turbine control is accurate measurement of the speed. The plot shows a turbine with a constant speed of 5000 rpm being measured by a device with an accuracy of 0.25% and one with an accuracy of 0.01%. The less accurate measurement will require either a filter or averaging routine to improve the accuracy or significant de-tuning to prevent unnecessary reaction of the speed controller. The red line is an RMS average of the black (0.25%) plot over 5 scans. The Cyan line is the RMS average over 10 scans. The speed select block will take up to four speed inputs and output a sele
您可能关注的文档
- 3.510第十章冗余系统汇编.doc
- 5206主运顺槽作业规程汇编.doc
- 6.国际技术贸易汇编.ppt
- 4周转物资租赁合同(2016营改增版)汇编.doc
- 30种饼的做法汇编.doc
- 5月16日-5月20日第十一周汇编.doc
- 35KV架空集电线路、箱变运行规程汇编.doc
- 4.1-4.2概述,资金筹集核算汇编.ppt
- 5S(学员版2)汇编.ppt
- 3小高炉操作技术规程汇编.doc
- 自然灾害灾情统计 第2部分:扩展指标.pdf
- 2026年湛江市麻章区烟草系统人员招聘考试模拟试题及答案解析.docx
- 2025年浙江省卫生健康系统人员招聘笔试试题及答案解析.docx
- 2026年山东省潍坊市烟草系统人员招聘笔试备考题库及答案解析.docx
- 2026年钦州市钦北区烟草系统人员招聘考试模拟试题及答案解析.docx
- 2026年江西省宜春市烟草系统人员招聘笔试参考试题及答案解析.docx
- 全面风险管理年度工作总结报告.docx
- 2026年陕西省宝鸡市卫生健康系统人员招聘笔试备考试题及答案解析.docx
- 2025年吕梁地区卫生健康系统人员招聘考试试题及答案解析.docx
- 2026年淮南市大通区烟草系统人员招聘笔试备考试题及答案解析.docx
原创力文档

文档评论(0)