InsulationtestingmethodInsulationtestingmethod
Insulation testing method: to observe the inspection before.
2.15 pipe insulation layer thickness and the flatness of the deviation should be allowed to meet the provisions of this specification table 4.4.8.
3 system hydrostatic test and debug
3.1 heating pipe hydraulic test pressure shall be 1.5 times the working pressure, but shall not be less than 0.6 MPa.
Inspection method: under the pressure test pressure drop is not greater than 0.05 MPa within 10 min, and then fell to work under pressure to check, not not leak.
3.2 after the pipeline pressure testing qualified, should be flush.
Inspection method, field observation, to water turbidity not qualified.
3.3 should be water, heating the pipe flushing, the commissioning and debugging. When does not have the heating conditions, should be postponed.
Inspection method: the building thermal measurement for the return water temperature and pressure at the entrance.
3.4 heating pipes for water pressure test, the test tube on the valve should be open, experiment pipe and the pipe should be blocked.
Test method: open and close the valve to check.
A. 1.1 finished product protection
5.1 installed pipe shall not be used as crane load and support, and stamped on, or when a fixed point in the construction.
5.2 cover ditch cover plate, should pay attention to protect, not collision damage.
5.3 all kinds of valves and accessory device should be installed protection cover plate, not pollution, smashing touch damage.
6, should pay attention to quality problems
6.1 pipe slope uneven or down the slope. Reason is the hanger spacing is too large, cause local pipeline prolapse, the slope is uneven. Installed on the pipe after open, interface later not straightening.
6.2 hot water heating system after warming, local is not hot. Reason is the main slope is not enough or laying down slope, the system of exhaust system installation position is not correct, the system of air cannot successful eduction, or there are foreign bod
您可能关注的文档
- HTTP协议头.doc
- HTTP服务七层架构技术.doc
- HullFund7eCh04ProblemSolutions.doc
- human resource management of state-owned enterprises Methods and ways of personnel quality.doc
- HW_U3B4教师版.doc
- Humanization Management.doc
- HW_U4B4(教师版).doc
- Hydromechanical analysis of Placing and protecting fill(坝体填料的填筑保护及基础流体力学行为分析).doc
- Hyperion Performance Suite 8 技术白皮书.doc
- Hypogonadism.docx
最近下载
- (完整word版)人教版四年级上册数学复习教案.doc VIP
- 煤矿安全操作规程(2023年).docx
- 工作相关肌肉骨骼疾患的工效学预防指南 第 4 部分 轨道交通设备制造作业.pdf VIP
- 园林景观工程施工计划.pdf
- OC IIS的定义(液晶玻璃的检验与不良判定).ppt VIP
- 2025届高考语文复习:文言文阅读+课件.pptx VIP
- 大班数学《坐船去探险》教案课件材料.doc VIP
- 工作相关肌肉骨骼疾患的工效学预防指南 第 6 部分 木质家具制造作业.pdf VIP
- 初中英语八年级上册首字母填空专项练习(共100题,附参考答案).doc
- 工作相关肌肉骨骼疾患的工效学预防指南 第 9 部分 公交车驾驶作业.pdf VIP
文档评论(0)