- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
StructureduringtheperiodofconstructionStructureduringtheperiodofconstruction
Structure during the period of construction, geometric size control is good, the metope to vertical, level off, before decorating handle carefully at the base. Should strengthen the inspection for the work of grass-roots base, qualified rear can be carried out under the procedure.
(3) carefully before construction according to the drawing size, check the actual situation of the structure construction, combined with block block brick to fine line, row, bread stick ash control points to meet the requirements.
6.3.4.3 construction technology
6.3.4.3.1 process
Basic level processing - hung vertically, set square, find rules - stick ash cake to wipe the underlying mortar, play the line separating - row - leaching brick to set furring brick, brick tick off seam and seam
6.3.4.3.2 operation process
(1) matrix method for the operation of the concrete wall
1) the basic level processing: will jut out metope between concrete flat, for the substrate concrete surface is very smooth to cut hair, or with mixed interface adhesive agent of fine cement mortar small hair wall, also can brush interface agent, water and moisture at the grass-roots level.
2) 10 mm thick 1:3 cement mortar matrix, should be layered points plastering mortar, along with solid, leveling with rub hair.
3) for six or seven bottom ash into works, according to the requirements of drawings, glazed tile specification and combined with the actual conditions of brick, the elastic line.
4) row: according to the details and the brick wall size in relation to the row, in order to ensure uniform tile aperture, conform to the requirements of the design drawings, pay attention to the big walls, pillars, and buttress to the brick, and in the same bearing arrangement on metope, shall have a less than l / 4 bricks of the brick. Less than a full brick row should be no secondary parts, such as Windows or internal Angle of the wall between. But also pay attention to consistent and symmetry. In case of card for outstand
您可能关注的文档
- Sino-U.S. Business Negotiations.doc
- sis系统分析系统分析 - 副本.doc
- Six Sigam tools Translate.doc
- SIYB创业计划书(范本).doc
- Neuroendoscopy.doc
- SJ002 《龙湖地产立体化景观塑造11大秘籍与体验区景观营造暨龙湖经典项目深度考察》.doc
- sketch快捷键.doc
- SKD 开题报告参考格式.doc
- Skopos Theory.doc
- SKII最终版.doc
- 中国行业标准 GM/T 0126-2023HTML密码应用置标语法.pdf
- 《JJF 2121-2024恒转速源校准规范》.pdf
- 餐饮服务中20条处理要点.docx
- 《GM/T 0011-2023可信计算 可信密码支撑平台功能与接口规范》.pdf
- 《JJF 2134-2024旋转流变仪校准规范》.pdf
- JJF 2121-2024恒转速源校准规范.pdf
- 计量规程规范 JJF 2121-2024恒转速源校准规范.pdf
- 《JJF 2118-2024压力式六氟化硫气体密度控制器校验仪校准规范》.pdf
- JJF 2134-2024旋转流变仪校准规范.pdf
- 计量规程规范 JJF 2134-2024旋转流变仪校准规范.pdf
文档评论(0)