ThehandlingofthecableandscaffolderectionThehandlingofthecableandscaffolderection

The handling of the cable and scaffold erection: A. carrying cable for short periods of time, generally adopt the method of rolling cable shaft. Rolling in the cable axis direction of the arrow on the scroll, if there is no arrow, according to cable winding direction rolling, in order to avoid cable is loose. B. cable bracket construction site should choose good, convenient in installation, general should be near the cable to the starting point is advisable. Cable head rotation direction should be paid attention to when the erection, cable which leads to the party should be above the cable shaft. 7.8.5.1.2 construction technology (1) direct buried cable laying Cable is buried channel along the selected route mining, and then put the cable buried within the channel. For cable directly buried in the ground, do not need other facilities, so the construction is simple, low cost, the cable heat dissipation is good. In small number of cables are commonly equipped distance longer use this method. 1) cable buried requirements A. the cable route path is likely to make the cable from mechanical damage, chemical action, vibration, thermal effects, such as pest danger area, protection measures should be taken. B. the buried depth of the cable shall meet the following requirements: the distance from ground cable surface should not be less than 0.7 m, through farmland should not be less than 1 m, with only the introduction of buildings, cross and bypass the underground buildings and underground architecture, can be buried shallow, but protection measures should be taken. In cold region, under the cable should be buried in permafrost, when not buried deep, measures should be taken to (such as casing). C. between cable, cable and other pipes, roads, buildings, etc when parallel and cross, the minimum distance between should comply with the rules. D. cable after railway, highway, city streets, factory, road should be laying in the solid protection tube. Tube zenith distance barrier

文档评论(0)

cxiongxchunj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档