The main body construction stage of level measurement
1, to the construction drawings given elevation as level elevation according to 0.00 mm, irfpa from building to building measurement and transmission parts, upward elevator well, pipe well inside the wall (not less than two) be clearly marked as upward putright elevation according to the structure construction, each floor elevation to basis as an original point in the 50 m steel rule after check up measurement, and tag them as the layer of the level elevation.
2, this project because the area is larger, putright points based on multiple level in the construction, so we must adopt closed legal check multiple levels according to some rules construction survey.
6.2.1.1.6 building settlement observation
Building settlement observation to execute the ministry of construction building deformation measurement procedures JGJ8-2007. According to the deformation measurement level 2 technical requirements. (note: the procedures article at 2.0.5 regulation, primary sedimentation observation point elevation difference error ≦ 0.15 mm, height of secondary sedimentation observation point error ≦ 0.50 mm, consider instrument rating on the construction site, in accordance with the requirements for measuring secondary sedimentation observation)
6.2.1.1.6.1 point layout
Point layout as shown in the settlement observation point layout table.
The name of the point request number
Reference point deformation influence beyond, to long-term preservation of stable position monitoring point 2
Work basis points close to the observation point, easy observation of a stable position since settlement observation point 4
Observation point can reflect the characteristics of the building settlement points to determine the building settlement
Using the known level point or settlement has stable buildings built. Scene four heads of leveling points as a work basis points. Outside the observation point layout in building large Angle and eav
您可能关注的文档
- The 5S methodology as a tool for improving the organisation.doc
- The 13th tip of DB Query Analyzer.doc
- The Advantages of Nuclear Energy.doc
- The Agreement in Natural Education Philosophy between Chuang-Tzu and Rousseau.doc
- The 12th tip of DB Query Analyzer, powerful in text file process.doc
- The accomplishment of party spirit.doc
- the America religious culture(美国宗教文化).doc
- The Analysis of Anxiety in Englsih Learning.doc
- The Application of English.doc
- The audacity of hope.doc
- 2025届衡阳市第八中学高三一诊考试物理试卷含解析.doc
- 2025届湖南省娄底市双峰一中等五校重点中学高三第二次诊断性检测物理试卷含解析.doc
- 天水市第一中学2025届高三第二次联考物理试卷含解析.doc
- 2025届金华市重点中学高三考前热身物理试卷含解析.doc
- 2025届北京市石景山区第九中学高三第四次模拟考试物理试卷含解析.doc
- 江苏扬州市2025届高三第一次模拟考试物理试卷含解析.doc
- 2025届江苏省南通市高级中学高考物理五模试卷含解析.doc
- 广东省清远市华侨中学2025届高三第一次调研测试物理试卷含解析.doc
- 辽宁省凤城市2025届高三第五次模拟考试物理试卷含解析.doc
- 内蒙古巴彦淖尔市重点中学2025届高考仿真卷物理试卷含解析.doc
文档评论(0)