The type of construction organization design.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ThetypeofconstructionorganizationdesignThetypeofconstructionorganizationdesign

The type of construction organization design Construction organization design can be divided into three categories: construction organization design outline and construction organization design and special construction organization design. 1. An outline according to the preliminary design and construction organization design tender documentation is used for construction layout to make overall arrangement, meet the needs of the bid, is the design of the principle, special is the preparation of construction organization design and construction organization design basis, belongs to the construction organization design before bidding. 2. The total construction organization design is based on a number of unit engineering group as the main object, according to the initial design or enlarge the preliminary design drawings, construction contract, construction organization and design outline as well as other relevant data and establishment of site construction conditions, its content and scope is summed up, is the preparation of special construction organization design basis, belong to the bid after the construction organization design. 3. Special construction organization design is a complex and special operation project as the main object of establishment, the construction process of special engineering plays a role of guidance and restriction, belongs to the bid after the construction organization design. Second, the construction organization and design of the principle and basis (a) the construction organization and design principles 1. Abide by the national project of the construction of the laws, regulations, guidelines and policies, technical standards and specifications. 2. In line with the construction of the contract or the technical and economic indexes of the tender documents (schedule, quality, safety, cost, etc.). 3. Observe the basic construction project procedures, the use of reasonable construction sequence and construction technique. 4. The use of

文档评论(0)

cxiongxchunj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档