Workers work condition.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
WorkersworkconditionWorkersworkcondition

Workers work condition. B team to catch up with progress, using the part of a team of the rest of the no logo parts and bolts, lead to the construction drawings Gold with into ordinary carbon steel bolt on the connecting bolts. After the check, has not been a, b two teams to the project department material supply department need to submit the materials With plan. Heat pipe compound event 2: technology and quality inspections before water pressure test, found that pipeline advocate material (steel tube) No manufacturers certificate of material and the factory certificate, nor any other inspection, inspection records. According to the working people Member memories: steel pipe supplied by construction unit, engineering was due to the material supply lag, has affected the progress. Steel tube to the scene No factory certification, the construction unit responsible for material supply, said by the construction unit responsible for material quality, first, the construction Lattice after repair. Construction unit for construction unit of the supply of materials, there is no other inspection, directly to the construction, the group After completion of welding is not to carry out the certificate of approval. Second, the analysis and the reference answer 1. Engineering materials in the project department should be how to manage? Material comes into play must plan according to feed, feed, guarantee of quality or product certificate, quantity and material Quality acceptance. Acceptance of the work in accordance with the quality acceptance specification and measurement test rules; Acceptance content including varieties, specifications, models, quality, quantity, certificates, etc.; Acceptance is to be recorded, acceptance procedures; to Please recheck the material should be sampling inspection certificate report; To do not conform to the requirements of the plan or quality unqualified material should refuse to accept. 2. 2, no factory certificate for constructi

文档评论(0)

cxiongxchunj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档