- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
北京英文翻译公司精诚翻译北京英文翻译公司精诚翻译
精诚翻译 全网最低5元百字起(市场价格10元,比传统翻译机构低40%左右,互联网+时代,省去中间的环节,价格低于翻译行业任何家翻译机构,5年经验保证,首推先翻译后付费模式,无效免单,免费试译,免费修改,为很多的大型外企和国企翻译过许多专业文件!五周年庆,五折优惠中,可以百度搜索“精诚翻译”找到我们!
Construction Plan and Technical Measures
Section 1 Construction Preparation
(A) Organizational Preparation
Build engineering project managing department. Appoint someone who is equipped with sophisticated technology and rich engineering experience, and has corresponding project manager qualification as the project manager, at the same time, build a project team which consists of skilled construction and technical management personnel who have rich experience for preparation work. Select a construction team which is well organized, build material base and other temporary facilities.
(B) Preparation in construction site
Carry out unified planning after arrival, carefully erect temporary facilities and arrange electricity, water supply and drainage and fire fighting facilities for construction so as to facilitate smooth production.
(C) Labor force organization
1. Construction quality of our company is great, which is related to our excellent teams employed by us. In this project, excellent construction, installation and coating personnel will be transferred from a few best teams to build a great construction team which is reasonably organized.
2. Before the commencement of construction, responsible person, technical staff, security staff and workers need to accept special energy-saving training, and construction personnel need to accept level-3 safety training.
(D) Materials preparation
Make plans for all kinds of materials, components and equipment. Carry out inspection and maintenance for those materials, components and equipment and ensure that they are in standby condition.
(E) Construction equipment
1. Main construction machinery is the key to quick and timely completion of the project, therefore, we must fully take features of the project into consideration, advantages and characteristics or our company in m
您可能关注的文档
- 剪力墙模板施工方案.doc
- 剪力墙洞口上的梁,按框架梁来输入还是按连梁来输入.doc
- 剪力墙开洞、楼板开洞.doc
- 力学实训教师指导手册.doc
- 副总经理工作职责.docx
- 办 公 用 品 管 理 办 法(下发).doc
- 办事指南物业管理服务草案.doc
- 办公大楼物业管理工作总结.doc
- 办公室5S管理办法.doc
- 办公室内勤工作手册.doc
- 2024学年广东省肇庆市科目一模拟考试100题【标准卷】.pdf
- 2024安全培训试题含答案【达标题】.pdf
- 2024年人教版数学五年级下册长方体的体积教学反思3篇.pdf
- 2024年五年级上册语文教学工作总结(四篇).pdf
- 2024年中药学类之中药学(中级)高分通关题库A4可打印版.pdf
- 2024小学生汉字听写大会竞赛模拟考试题(含答案).pdf
- 2024年《邹忌讽齐王纳谏》教学反思(精选篇).pdf
- 2024届河南省安阳市高三下学期第一次模拟考试文综地理试题.pdf
- 2024年云南省成人高考专升本《教育理论》考前自测卷及答案.pdf
- 2024年人教PEP版四年级英语上册看图写单词同步专项练习题.pdf
文档评论(0)