- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
泄洪道闸门英文泄洪道闸门英文
Spillway Gates
Spillway gate installations are a critical part of a reservoir and dam system. Their reliability is important for the safety of dams. Jack Lewin and Jonathan Hinks explain why spillway gate design, maintenance and operation require close attention.
In a number of exceptional cases, particularly in the former Soviet Union, bottom outlets are made large enough to discharge flood flows. However, in the vast majority of cases, a spillway is required to deal with flood inflows to a reservoir. Where an uncontrolled weir would be excessively long, or the requirement for freeboard too great, a gated spillway may be the most economic solution.
Particularly in the developing word, there is a preference for uncontrolled weirs because the risk of electrical or mechanical malfunction, or human error in operation id eliminated.
For large dams the spillway will usually designed to pass a flood no smaller than that with a return period of 10,000 years. For the bigger dams and for all major dams in the US, UK, Australia and other countries, design will be for the probable maximum flood(PMF). There is mo fixed relationship between the PMF and the flood with a return period of 10,000 years but the PMF peak outflow will often be about twice that in the 10,000year flood.
The UK guide Floods and Reservoir Safety, published by the Institution of Civil Engineers, suggests that gated spillways should have a minimum of two gates. Many engineers require at least three gates. These should be sized so that any two can pass 70% of the spillway design flood in the event of one gate being serviced behind stop logs or non-operational for other reasons. The assessment of the need for redundancy will usually take into account whether standby facilities for gate operation are provided and whether repairs to potentially vulnerable elements can be carried out between receipt of flood warning, or onset of the flood and the advanced stage when all gates are required to discharge the f
文档评论(0)