p h m s l n g form18施工检查( p h m s a form18 l n g construction inspection).docVIP

p h m s l n g form18施工检查( p h m s a form18 l n g construction inspection).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
LNG Construction Inspection – Inspection Modules Introduction Instructions The construction of an LNG facility usually takes approximately two years. The PHMSA Form 18 Evaluation of LNG Facility Siting, design, Construction, and Equipment (Rev. 3/18/09) (“Form 18”) consists of 40 pages addressing the construction requirements of 49 CFR Part 193. The purpose of this document is to break the Form 18 into inspection modules that can be individually accomplished more or less bimonthly so that all of the elements of the Form 18 can be addressed prior to operation of new LNG facilities. Note that not all modules will apply to all LNG facilities, more than one module may be completed per site visit, and an individual module may take more than one site visit to complete. The modules are solely for the convenience of the Inspector and the Operator. All of the usual inspection procedures apply and the entire Form 18 must be completed before the inspection is complete and the documentation added to the permanent Operator File.. Use of the Form 18 Post Inspection Memorandum (PIM) is NOT recommended. An Activity ID should be established for each new LNG facility. Information regarding each site visit should be recorded as a separate assignment under the same Activity ID number. At the conclusion of the inspection, the Activity Report should be used as the Post Inspection Memorandum. Be sure to consider this as the Assignment Activity report is prepared for each site visit. Above all, keep up with the Assignment Activity entries and the entries into the overall Form 18 as each site visit is completed. A completed Form 18 should be submitted to the Regional Director within 60 days of completion of the inspection. The Assignment Activity Report (serving as the PIM) should be completed and submitted to the Regional Director within 30 days of completion of the inspection (completion of all Modules) and must be filed with the final copy of the Form 18. Modules (

您可能关注的文档

文档评论(0)

guanjie8song + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档