- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
054污水处理厂接纳标准(CSSD)bianf_02_007.
Utility Services - Sewage
Sewage
SIP has its own Sewage Treatment Works was developed by CSSD and has started operation since November 1998. The current treatment capacity of this plant is 100,000 m3/day and will be increased to 500,000 m3//day as the park develops.
Fee and Tariffs
The fee structure for sewage is similar to that of water. There are one-off payments for connecting to the sewage network. These are the Increased Capacity Fee (增容费) and Engineering Fee (工程费). In addition, there are monthly consumption fees.
Increased Capacity Fee
This will be computed based on 80% of the daily peaked capacity consumption of water at RMB 600/m3
Note: Sewage is discharged through a designated connection point under the road surface fronting the user’s land plot. All charges incurred in connecting to its own premises is the user’s responsibility. (See Engineering Fee).
Engineering Fee
These are the fees incurred for connecting the sewage and rainwater pipes from designated points near the outside boundary of the user’s land plot to the user’s premises. The estimated costs:
Connection of a sewage pipe (DN 300mm, L25 m) RMB 2500
Connection of a rainwater pipe (DN450mm, L10 m) RMB 400
Consumption Fee (Wef 1 April 1998)
Industrial Sewage RMB 0.80/ m3
Commercial Sewage RMB 0.80/ m3
Domestic Sewage RMB 0.80/ m3
Utility Services - Sewage
SIP Sewage Discharge Standard (Same as State)
Sewage Discharge Parameters Standard (mg/L) Upper Concentration Limits for the First Class Pollutants 1 Total mercury 0.05 2 Alkyl mercury Must not be detected 3 Total cadmium 0.1 4 Total chromium 1.5 5 Hexavalent chromium Compounds 0.5 6 Total arsenic 0.5 7 Total lead 1.0 8 Total nickel 1.0 9 Total beryllium 0.005 10 Total argentum 0.5 Upper Concentration Limits for the Second Class Pollutants 1 pH value 6-9 2 Total Suspended Solids (TSS) 400 3 Grease Oil 100 4 Mineral Oil 30 5 Formaldehyde 5.0 6 Benzene series compounds 2.5 7 Tot
您可能关注的文档
- 042外墙外保温技术交底..doc
- 042高空散装法安装工艺..doc
- 043章椎管内麻醉的意外及并发症..doc
- 044普通心理学..doc
- 04465-08-00真空助力器带制动主缸总成台架试验..doc
- 043-雷公炮制药性解..doc
- 045生产区域界区划分管理..doc
- 045105学科教学(物理)..doc
- 0494上博楚简《柬大王泊旱》之灾异思想..doc
- 044神经外科手术麻醉..doc
- 2023年无锡市公务员考试行测试卷历年真题及完整答案详解1套.docx
- 2025年江海职业技术学院单招(语文)测试题库含答案.docx
- 2025年毕节医学高等专科学校单招(语文)测试模拟题库及完整答案1套.docx
- 2025年乡镇警察面试题及答案.doc
- 2025年乡镇职工面试题库及答案.doc
- 青海省西宁市2024-2025学年高一下学期期末语文试题(含答案).docx
- 福建省2024-2025学年五年级下学期英语暑假巩固培优提高卷(含解析).docx
- 四川省阿坝藏族羌族自治州2024-2025学年高一下学期7月期末英语试题(含答案).docx
- 人教版(2024)七年级英语上册期末能力提升卷1(含答案).docx
- 江西省赣州市石城县2024-2025学年七年级下学期期末质量监测英语试题(含答案).docx
文档评论(0)