在日本一种重要技术应用于特高压交流变电站..docVIP

在日本一种重要技术应用于特高压交流变电站..doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
在日本一种重要技术应用于特高压交流变电站.

Important technologies applied for UHV AC substations in Japan Abstract The Tokyo Electric Power Company, Inc (TEPCO) plans 1100 kV power network system in Japan in order to meet the steady increasing demand for electricity. Four-hundred kilometer 1100-kV-designed double-circuit transmission lines have already been constructed and are now operated at 550 kV. 1100-kV substation equipment has also been developed. To realize the best design technically and economically throughout the transmission line and the substation, important technical solutions for network problems peculiar to the ultra high voltage (UHV) system have been introduced. They include insulation coordination, overvoltage countermeasures, and fast multi-phase reclosing systems with high speed earthing switches (HSESs). The overvoltage countermeasures are realized by high performance metal oxide surge arresters (MOSAs), gas circuit breakers (GCBs) with closing/opening resistor, and disconnectors (DSs) with resistor. These sophisticated technologies realize highly reliable and economical UHV substations and transmission lines. This paper describes important, fundamental, and specific requirements for UHV substations such as their compactness, economical view, and environmental harmony. There are many technical/economical aspects to be considered on UHV substation and based on those considerations: (a) compactness, (b) less impacts to the environment, (c) optimizing cost, could be fulfilled. This paper also describes the technologies addressed to UHV class components such as the introduction of new concept ‘‘on-site assembly transformer,’’ VFTO reduction countermeasure and the necessity of fullscale seismic qualification test. Copyright ?2011 John Wiley Sons, Ltd. key words UHV; substation; GIS; insulation coordination; high performance surge arrester; disconnector with resistor; gas circuit breaker with closing/opening resistor; high speed earthing switch;seismic qualification INTRODUCTION The Tokyo

文档评论(0)

sdgr + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档