PURPOSE
SCOPE
RESPONSIBILITY
REFERENCE
TIMING AND FREQUENCY OF PHA
PHA PROCEDURE
PHA REPORT PROCEDURE
RECOMMENDATION FOLLOW-UP
PHA COMMUNICATION
UPDATE PROCESS INFORMATION
PHA CLOSING
REVISION HISTORY
ATTACHMENTS
A: Site Cyclic PHA Program
B: PHA Procedure Flow Chart
C: PHA Report
D: PHA Discussion Form
E: PHA Recommendation Closure Form
F: PHA Communication Form
G: Process Information Update Closure Form
1.0 PURPOSE
This procedure is to provide general guidance for conducting a Process Hazards Analysis (PHA), documenting findings and issuing the report in a systematic and structured manner.
2.0 SCOPE
PHA is an effective tool for identifying, evaluating, and controlling hazards at various times and stages in the life cycle of a process. PHA must be done, in the following cases:
New project or facilities
Existing facilities for higher-hazard processes – Cyclical PHA
Mothballing a process facility
Dismantling a process facility
Other areas, in which PHA can be used to identify and evaluate hazards, including the following:
Management of change activities
Unusual incident investigations
Existing low-hazard operations - LHO
3.0 RESPONSIBILITY
The plant PSM coordinator is responsible for keeping this procedure and the cyclic PHA schedule updated. (Attachment A)
It is the responsibility of any individual requiring a PHA to be carried out to initiate the PHA form and ensure that it is followed through to completion.
It is the responsibility of the PHA administrator to:
Keep and control the PHA numbers list
Keep and control a master list of all PHA
Keep a file of the original of all the authorized PHA forms
Keep and maintain filed all the PHA Reports issued
Maintain a follow-up list of all PHA recommended actions
Maintain a follow-up list of all PHA Process Information update
4.0 REFERENCE
Corporate Standard S21A – Process Safety Management, and S25A – Process Hazards Analysis.
5.0 TIMING AND FREQUENCY OF PHA
5.1 New Facilities
Consiste