网站大量收购独家精品文档,联系QQ:2885784924

SHE - 604 PHA PROCEDURE.doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CONTENTS PURPOSE SCOPE RESPONSIBILITY REFERENCE TIMING AND FREQUENCY OF PHA PHA PROCEDURE PHA REPORT PROCEDURE RECOMMENDATION FOLLOW-UP PHA COMMUNICATION UPDATE PROCESS INFORMATION PHA CLOSING REVISION HISTORY ATTACHMENTS A: Site Cyclic PHA Program B: PHA Procedure Flow Chart C: PHA Report D: PHA Discussion Form E: PHA Recommendation Closure Form F: PHA Communication Form G: Process Information Update Closure Form 1.0 PURPOSE This procedure is to provide general guidance for conducting a Process Hazards Analysis (PHA), documenting findings and issuing the report in a systematic and structured manner. 2.0 SCOPE PHA is an effective tool for identifying, evaluating, and controlling hazards at various times and stages in the life cycle of a process. PHA must be done, in the following cases: New project or facilities Existing facilities for higher-hazard processes – Cyclical PHA Mothballing a process facility Dismantling a process facility Other areas, in which PHA can be used to identify and evaluate hazards, including the following: Management of change activities Unusual incident investigations Existing low-hazard operations - LHO 3.0 RESPONSIBILITY The plant PSM coordinator is responsible for keeping this procedure and the cyclic PHA schedule updated. (Attachment A) It is the responsibility of any individual requiring a PHA to be carried out to initiate the PHA form and ensure that it is followed through to completion. It is the responsibility of the PHA administrator to: Keep and control the PHA numbers list Keep and control a master list of all PHA Keep a file of the original of all the authorized PHA forms Keep and maintain filed all the PHA Reports issued Maintain a follow-up list of all PHA recommended actions Maintain a follow-up list of all PHA Process Information update 4.0 REFERENCE Corporate Standard S21A – Process Safety Management, and S25A – Process Hazards Analysis. 5.0 TIMING AND FREQUENCY OF PHA 5.1 New Facilities Consiste

文档评论(0)

yyanrlund + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档