simplifiedprocedurefor h p m vroutes- n z transport agency(simplifiedprocedurefor h p m vroutes z - n运输机构).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Simplified Procedure for HPMV routes
Introduction This procedure provides a simplified method for evaluating the costs and benefits of upgrading road infrastructure to accommodate high-productivity motor vehicles (HPMVs) on a specified route from source of freight to destination. The procedure is designed for bridge strengthening works plus upgrading works for pavements, surfacings and geometry.
In this simplified procedure, the assumptions are:
Benefits come from the reduced number of heavy commercial vehicle (HCV) trips that result from permitting freight to be carried by HPMVs on the route. These benefits are mainly savings in vehicle operating costs, CO2 and accidents.
Travel time for freight is unchanged.
Other benefits, including seal extension benefits, are not significant.
The route is mainly rural.
Benefits start at a low level and increase linearly until full benefits are achieved after a defined number of years
Costs are the additional costs for works shown by structural and safety analysis to be necessary to accommodate HPMVs on the route plus other relevant costs.
Bridge upgrade costs are spread evenly over a defined number of years.
The do minimum is to do nothing.
The analysis period is 30 years.
An 8 percent discount rate is used.
All costs are exclusive of GST.
In cases where the above assumptions are not appropriate, either the simplified procedure should be modified or full procedures used.
This simplified procedure is designed to consider one option at a time. If there is more than one option, use incremental analysis of the costs and benefits of the different options (worksheet 5).
To use the worksheets, it is necessary to first determine:
the efficiency gains from using HPMVs on the route (the number of HCV trips saved for a given amount of freight)
the bridge upgrade works required to accommodate HPMVs, and their costs and timing
the additional pavement costs attributable to HPMVs using the route, and the timing for these costs. Worksheet De
您可能关注的文档
- selected excerpts– m v d d s service rules(选择摘录——m v d d s服务规则).doc
- semi- annual report(半年报)(16页).doc
- sensorstoimprovethesafetyforwheelchairusers(5页).doc
- semi- annual report(半年报).doc
- series90-30 p l c guide form specification(series90-30 p l c规范指导形式)(28页).doc
- series90-30 p l c guide form specification(series90-30 p l c规范指导形式).doc
- sewage sludge- new jersey(污水污泥-新泽西)(46页).doc
- sewage sludge- new jersey(污水污泥-新泽西).doc
- shapefromshadingnotesfromgoogles- massey university(shapefromshadingnotesfromgoogles——梅西大学)(13页).doc
- shapefromshadingnotesfromgoogles- massey university(shapefromshadingnotesfromgoogles——梅西大学).doc
- site survey` template'(网站调查模板)(25页).doc
- sixthgradehistorystrandsemphasizeworldhistoryfromits.doc
- sixthgradehistorystrandsemphasizeworldhistoryfromits(17页).doc
- small water system management program guide(小型供水系统管理程序指南)(97页).doc
- social structureand anomie- p bworks(社会structureand失范- p bworks)(6页).doc
- social studies assignment- facultyof education(社会研究任务——facultyof教育)(6页).doc
- social studies assignment- facultyof education(社会研究任务——facultyof教育).doc
- social, political,and economic networksin late bronze age(社会、政治和经济networksin青铜时代晚期)(11页).doc
- social, political,and economic networksin late bronze age(社会、政治和经济networksin青铜时代晚期).doc
- software configuration management plan template(软件配置管理计划模板)(8页).doc
文档评论(0)