executive status reporting instructions(执行状态报告说明).doc

executive status reporting instructions(执行状态报告说明).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Executive Status Reporting Instructions TABLE OF CONTENTS 1 INstructions 3 1.1 Status Categories 3 1.2 Red, Yellow, Green Guidance 3 2 Executive Milestone Overview 4 3 Project Status Summary 4 4 Project Milestone Status Review 4 5 integration Milestone Status 5 6 Project Issue Summary 5 7 Project Risk Summary 6 8 eXECUTIVE ASSISTANCE rEQUEST 6 9 Project Notes 7 INstructions Status reports should be filled out in enough detail and with sufficient context so that individuals with only a marginal understanding of the operations of the project will be able to read the report in a stand-alone manner and comprehend the status of the project. The following instructions address status report sections and highlight what should be done to complete the status report correctly. Status Categories Throughout the status report where either an Executive Milestone (EM) or a Project Milestone (PM) is identified, a column for “Status” is provided. The following responses are suggested for use in these columns: defined, planned, active, late and complete. The following guidance is provided to determine when to use each status category: Defined: “Defined” indicates that the milestone has been identified and defined, but planning for the completion of the milestone has not been completed (e.g., you generally would not have finalized a completion date). This option is typically used during the initiation and early planning phase of a project, project phase, or significant iteration. Planned: “Planned” indicates that activities to achieve the milestone have been appropriately planned for, and a baseline completion date has been established. Milestones indicated as being “Planned” should have a very high degree of confidence indicated, and in general few activities directed at achieving the milestone should be underway. This option is typically used during the planning phase of a project, project phase, or significant iteration. Active: “Active” indicates planning for the mile

您可能关注的文档

文档评论(0)

bgl001 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档