safeworkmethodstatements-rooftilingsydney.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
safeworkmethodstatements-rooftilingsydney

ROOF TILING - SAFE WORK METHOD STATEMENT No 1 RISK RATING = 1 High risk / 2 Medium Risk / 3 Low Risk Site Address : _________________________________________________Builder / Owner:_________________________________ Contractor : _________________________________________________________________ ABN :_________________________ Sub-Contractor :_____________________________________________ Ph :____________________ Fax :____________________ Person Responsible : _____________________________________ Signed : ______________________________ Date : __ / __ / __ SWMS 1 NOTES : Refer O.H. S. Act 2000, O.H. S. Regulations 2001 and to relevant WorkCover Codes of Practice for Additional Information Standard activities Safe Work on Roofs – Part 2 for Residential Buildings, Electrical Practices for Construction Work ACTIVITY HAZARD RISK Control Measures or Safe Job Procedures 1. Working on a roof Fall from the edge __ 1. CONTROL MEASURES ARE REQUIRED AT ANY HEIGTH WHERE THERE IS A RISK OF FALLING or through the the such as Scaffolding (a securely fenced work platform) or secure perimeter screens, fencing, handrails or roof other forms of physical restraints that are capable of arresting the fall of a person. 2. Keep the soles of shoes clean. 3. Use two pairs of shoes in damp conditions – place a pair for walking on the ground at the base of the ladder, e.g. gumboots for muddy conditions and roofing shoes for ladder and roof (ladder must be tied off). 4. Erect ladder on a level and solid base away from overhead obstructions 5. Place ladder bases one metre out from the wall for every four metres in height and a minimum height of 1metre above the level of the roof access point. 6. Secure ladder with a gutter guard /ladder brackets and tie off. 7. Always maintain a minimum three point contact when climbing a ladder i.e. both hand

文档评论(0)

Bnr310822 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档