stallwarningsystem-nationalwildlandfire.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
stallwarningsystem-nationalwildlandfire

Compliance with SASEB Requirements. 1. FAA Certified as a Normal or Transport Category Aircraft. CN-235 is FAA certified in the Transport Category. 2. FAA approved to fly with the jumper exit door removed. CN-235 is approved to fly with the jumper door opened. The design of the door does enable the operation without the need to remove the door. 3. Airspeed at 1.3 V stall (jump configuration) not to exceed 115 Kts. CN-235 with 20 jumpers and fuel to fly for five hours has a Stall Speed, in jumping configuration, of 82 Kts. That means 1.3 V stall (jump configuration) is 106.6 Kts. 4. Jumper exit door at least 25 inches wide and 36 inches high. There are two Jumping doors at the rear of the cabin (35,43 inches wide and 67 inches high) and also jumping may be perform through the rear ramp (93 inches wide and 67 inches high) Multi-engine Aircraft 1. 1 to achieve a single engine (critical engine inoperative) rate of climb of 50 feet per minute (fpm) at 9,000 feet density altitude. With 95 % of MTOW , the CN-235 has a single engine rate of climb of 291 fpm 2. Ability to achieve a single engine climb capability of +.6 percent …… In these conditions, CN-235 has a rate of climb of 386 fpm Administrative Considerations The “Sponsor’s Report” needs to provide agency managers with information needed to make an informed judgment about the prospects for the proposed aircraft to fulfilling agency needs at an acceptable cost. Successful completion of this part of the report will generally require the skills of both experienced aviators and smokejumpers. 1. Support the need for the aircraft. Why are you proposing that this aircraft be evaluated? Why do you want to use this particular aircraft? What are the perceived advantages over aircraft already on the approved list? How many aircraft of this type do you propose to use, and how soon? Note: Careful reasoning here will help preclude the expenditure of time and money for aircraft that may “look good” but for which there is no real i

文档评论(0)

Bnr310822 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档