- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
exercise2-1(6页)
0BExercise: concepts from chapter 2
Reading: Fundamentals of Structural Geology, Ch 2
1) Develop a Matlab script that plots the spherical datum (Fig. 2.1a) with unit radius as a wire-frame diagram using lines of constant latitude and longitude. An example is given here as Figure 1.
Figure 1. Matlab plot of the spherical datum.
2) The mathematical datum used for the Global Positioning System (GPS) is the World Geodetic System datum for 1984 (WGS-84). The standard physical datum, usually referenced to local mean sea level at the coastline, is the geoid (Fig. 2.2). Explain what is meant by a ‘datum’ and describe the general differences between WGS-84 and the geoid.
3) Investigate the gnomonic projection (Fig. 2.3) from a spherical datum with radius taken as the appropriate semi-axis of the GRS-80 ellipsoid. Consider two cases, O(0, 0)
and O(?/2, 0), for the position of the origin O(??, ??) where the projection plane is tangent to the sphere. Use Matlab and equations (2.2) to plot lines of constant latitude and longitude in order to illustrate the distortion that is inherent to this projection. Describe these distortions.
4) Investigate the transverse Mercator projection (Fig. 2.4) from a spherical datum with radius taken as the appropriate semi-axis of the GRS-80 ellipsoid. Place the origin at the Greenwich meridian on the equator, O(??, ??) = O(0, 0), and let both the latitude and longitude extend ±?/4 to either side of the origin. To accomplish this projection use the following equations (Bugayevskiy and Snyder, 1995, p. 158):
Note that equations (2.3) in the text plot the projection with origin at the pole, but X and Y are interchanged (see Errata). Use Matlab and equations to plot lines of constant latitude and longitude on the projection at the equator in order to illustrate the distortion that is inherent to it. Describe these distortions.
5) Most GPS receivers have onboard computers that are capable of reporting locations using the Universal
您可能关注的文档
- environmentalchecklistforapropertyleased-hudu.s(9页).doc
- environmentalassessmentworksheet(75页).doc
- environmentalsciencesyllabus-atlantapublicschools(5页).doc
- envision(18页).doc
- enzymesanddetergents-winona(1页).doc
- eprints.covenantuniversity.edu.ng(58页).doc
- equivalentwidth,ew,isanequalarearepresentationofa(18页).doc
- ercotdctieoperationsdocument(19页).doc
- erosion&sedimentationcontrolplan(swppp)-cityoflos(133页).doc
- errorsanduncertaintyinexperimentaldata-lps(9页).doc
- 2025年五大连池市火山城市湿地公园服务中心招聘公益性岗位人员笔试备考试题及答案详解参考.docx
- 2025年乐昌市秀水镇村基层公共服务站系统操作员招聘(3人)模拟试卷含答案详解(培优).docx
- 2025年古浪县八步沙林场招聘财会、水利专业人员的(3人)笔试备考试题附答案详解(b卷).docx
- 2025年南宁市卫生健康委员会所属事业单位招聘医药卫生类急需紧缺笔试备考试题及答案详解参考.docx
- 2025年兴业银行呼和浩特分行“雏雁计划” 暑期实习生笔试备考试题及完整答案详解1套.docx
- 2025年兰州市事业单位招聘人员(785人)考前自测高频考点模拟试题含答案详解(综合题).docx
- 2025年佛山市第二人民医院招聘高层次人才(第一批)(6人)笔试备考试题附答案详解(精练).docx
- 2025年乐昌市秀水镇村基层公共服务站系统操作员招聘(3人)考前自测高频考点模拟试题附答案详解(实用.docx
- 2025年呼伦贝尔市第二人民医院招聘编外人员的(23人)模拟试卷及答案详解(真题汇编).docx
- 2025年同江市招聘临时工作人员(12人)考前自测高频考点模拟试题含答案详解(培优).docx
文档评论(0)